Laserfiche WebLink
Monitoring System Certification <br />I I I I . 111a DR LUJ U =1 <br />* Check this box if tank gauging is used only for inventory control. <br />* Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />• Yes <br />0 No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />• Yes <br />0 No* <br />Were all Link gauging probes visually inspected for damage and residue buildup? <br />• Yes <br />0 No* <br />Was accuracy of system product level readings tested? <br />• Yes <br />0 No* <br />Was accuracy of system water level readings tested? <br />• Yes <br />0 No* <br />Were all probes reinstalled properly? <br />• Yes <br />0 No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will he corrected. <br />I IIIIIIIIIII'M IIIII!I 1!11�1!1! <br />t: 711! 1 <br />Complete the following checklist: <br />0 Check this box if LLDs are not installed. <br />0 Yes <br />0 No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />n N/A <br />(Check all that apply) Simulated leak rate: [13 g.p.h.; 0 0.1 g.p.h; 0 0.2 g.p.h. <br />0 Yes <br />[I No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />0 Yes <br />0 No* <br />Was the testing apparatus properly calibrated? <br />0 Yes <br />0 No*For <br />mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />El N/A <br />0 Yes <br />0 No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />0 N/A <br />n Yes <br />0 No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />0 N/A <br />or disconnected? <br />Y <br />Yes <br />0 No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />0 N/A <br />malfunctions or fails a test? <br />Y <br />Yes <br />0 Yes <br />E0 <br />n No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />[I N/A <br />OYe <br />Yes <br />[I No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />This system has no ATG monitoring. <br />Emergency generator, suction system. <br />Pace 3 of 3 <br />