Laserfiche WebLink
SWRCB,. January 2002 FINAL DRAFT Page of 7 <br />9.SPILL/OVERFILL CONTAINMENT BOXES-.,. <br />tyLoitm- <br />ni <br />WMEM <br />Test Method Developed By: Spill Bucket Manufacturer El Industry Standard Professional i.iiii­ee� <br />El Other (Specifv) <br />Test Method Used: n Pressure El Vacuum Hydrostatic <br />El Other (Specif <br />.y) <br />Test Equipment Used: <br />Bucket Diameter: <br />!,ucket 11,epth: <br />VT ait time between n <br />pressure/vacuum ter and <br />starting test: <br />IT11 M1. 107M I. <br />Tinal Reading (RF): <br />Test Duration: <br />Equipment Resolution: <br />Change in Reading (RF -R): <br />'-- <br />Pass/Fail Threshold or <br />Criteria: <br />Comments — (Include information on repairs made prior to testing, and recommended follow-upfor failed tests.) <br />Spill/Overfill Containment Boxes are being tested annually with the Monitor Certifications, and are scheduled for the week of <br />9-20-2008. <br />Please direct any comments regarding this form to: <br />SWRCB UST Program, Attn: Scott Bacon <br />1001 "1" Street, Box 944212 <br />Sacramento, CA 95814 <br />Phone: (916) 341-5873, Fax: (916) 341-5809 <br />e-mail: baconsgcwp.swrcb.ca.gov <br />