Laserfiche WebLink
0 ItIr <br />SWRCB, January 2002 FINAL DRAFT Page 4 of 7 <br />6® PIPING SUMP TESTING <br />Test Method Developed By: El Sump Manufacturer Industry Standard Professional Engineer <br />El Ottier (Speci�y) <br />Test Method Used: El Pressure [I Vacuum Hydrostatic <br />Other (Specify) <br />I Test Equipment Used: Caldwell Sump Level Change Indicator <br />Equipment Resolution: 0.0025" <br />SUMP Sump <br />879-G3 879Dl� <br />Sunip Diameter: <br />Sump Depth from Top of Tank: <br />Sump Matefial: <br />Height from Tank Top to Top <br />t Piping Penetration - <br />12.25" <br />15.25" <br />Condition of sump prior to testmg: <br />Clean/Dry <br />Depth of Sump Tested' <br />RYes ONo MNA <br />MYes ONo EDNA <br />RYes F1No nNA <br />E]Yes E]No []NA <br />Turbine shutdown response time: 5 <br />11 Is system prograinnied for fad -safe i <br />I <br />i shutdown? <br />O)Y'es E]No EINA <br />MYes FlNo F]NA:: <br />Was fail-safe verified to be <br />ope tional?* <br />Oyes E]No EINA <br />■Yes VINo <br />n <br />E]Yes jKNA <br />OYes El No FINA 1 <br />Wait time between applying <br />- ------- <br />Test Start Time: <br />Test End Time: <br />1; Change in Reading <br />I Pass/Fad Threshold or Criterix <br />MOM <br />Was sensor removed for testing? <br />0 es E]No EINA <br />EDYes FINo ONk, <br />rYes []No EINA <br />Was sens-6 r--pro-p-erly replaced and <br />verifiedfunctional after testing? <br />OYes DNo DNA <br />nYes nNo nNA <br />nYes MNo I <br />-Comments — (Include information on Npam madepnor to testmg� and reconmended follo"u for failed tests.)__ <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO", then the entire sump should be tested. (See SWRCB LG -160) <br />El <br />