Laserfiche WebLink
Monitoring System Certification 0 <br />1011�llil 111111111 <br />1161;1.11'111��l <br />Software Version Installed: 5.03 <br />Camnlete the fallowing rhorkliet- <br />'T-� <br />'Y <br />• Yes <br />0 No* <br />Is the audible alarm operational? <br />• Yes <br />[] No* <br />Is the visual alarm operational? <br />• Yes <br />0 No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />• Yes <br />n No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br />will not interfere with their proper operation? <br />• Yes <br />0 No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br />Z N/A <br />operational? <br />ED Yes <br />[I No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />El N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) 0 Sump/Trench Sensors; 0 Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? 0 Yes; El No. <br />* Yes <br />0 No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br />ED N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br />* Yes* <br />Z No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br />replaced and list the manufacturer name and model for all replacement parts in Section E, below. <br />* Yes* <br />Z No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />0 Product; [I Water. If yes, describe causes in Section E, below. <br />* Yes <br />0 No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />* Yes <br />0 No* <br />Is all monitoring equipment operational per manufacturer's specifications? I <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />The Diesel system is "Safe Suction". Both tanks have mechanical overfill drop tubes. <br />System has a remote annunciator mounted on outside wall of building, facing the tanks. Operation was verified. <br />Safe suction of Diesel product was verified for SJC HAZMAT during monitor cert.(8-5-14) <br />Page 2 of 3 <br />