Laserfiche WebLink
SVVRCB. January 2002 FINAL DRAFT <br />Page 5 of 7 <br />1110 0% Ita Gk3VOI&IM -like] TESTING <br />Does Facility have UDC(s)? ZYes []No <br />Test Method Developed By: [♦ UDC Manufacturer Industry Standard Professional Engineer <br />El Other (Specify) <br />Test Method Used: El Pressure <br />El vacuum Hydrostatic <br />El Other (Specify) <br />Test Equipment Used: Caldwell Sump Level Change Indicator qment Resolution: 0.0025" <br />Comments – (Include information for failed tests.) <br />UDC's are monitored by Bravo float and chain, shear valve shut off. <br />if the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with <br />asterisk (*) is "NO", then the entire UDC should be tested. (See SWRC13 LG -160) i <br />UDC # <br />879-TFUGO <br />879-TFUGOI 42 <br />879-TFUDOI #5 <br />oated Steel <br />Mm <br />9: R M. ff Fff, M11 <br />M <br />I 10 Height from UDC Bottom t <br />1 <br />Lowest Electrical Penetm60n: <br />Condition of UDC prior to <br />EM <br />testipj: <br />Clead/Dry <br />Depth of UDC Tested:' <br />Does turbin1;i1: hu� t down when <br />LJDC sensor detects liquid (both <br />[]Yes E]No NNA <br />nYes E]No NNA <br />E]Yes E]No NNA <br />[]Yes E]No []NA <br />product and water)? <br />F14.,at with Chain <br />Float with Chain <br />Float with Chain <br />Is system programmed for fail- <br />o [QNA <br />E]Yes []No ONA <br />*–Yes ]KNoFRNA <br />shutdown?* <br />Was fail-safe verified to be <br />E]Yes [ -]No HNA <br />1 E]Yes MNo MNA <br />Flyes EjNo ONA <br />E <br />operationaff <br />Wait time betweerl— <br />pressure/vacuum/water and <br />i starting test: <br />' Test Start Time: <br />Test End Time: <br />BIRO <br />GO <br />off -if <br />Pass/Fail Threshold or Crite6a: <br />.0 <br />Was sensor removed or disabled <br />k <br />RYes MNo MNA <br />FlYes E]No MNA <br />fortestin? <br />FlYes E]No CANA <br />[]Yes E]No ZNA <br />E I <br />Comments – (Include information for failed tests.) <br />UDC's are monitored by Bravo float and chain, shear valve shut off. <br />if the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with <br />asterisk (*) is "NO", then the entire UDC should be tested. (See SWRC13 LG -160) i <br />