Laserfiche WebLink
0 0 <br />SWRCB. January 2002 FINAL DRAFT Page 4 of 7 <br />b® PIPING SUMP TESTING <br />Test Meth Developed By: Sump Manufacturer Industry Standard 0 Professional Engineer <br />E] Other (Specify) <br />Test Method Used: El Pressure El vacuum M Hydrostatic <br />Ej Other (Specify) <br />Test Equipment Used: Caldwell Sump Level Change Indicator Equipment Resolution: 0.0025" <br />Comments — (Include information on repairs made prior to testing, and recommended follow-up for failed tests.) <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO", then the entire sump should be tested. (See SWRCB; LG -160) <br />Sump # <br />879-TFUDOI <br />Sump # <br />Sump Diameter: <br />Sump Depth from Top of Tank: <br />27.25"11 <br />Sump Material: <br />FRP <br />Coated Steel <br />I Height from Tank Top to Top of <br />�est Pipin Penetration: <br />9 <br />Height from Tank Top to Top W_= <br />Electrical Penetration: <br />,�o,vesl <br />De th of Sump Tested' <br />p <br />it turbine shut down when <br />Sump sensor detects liquid (both <br />product and water)?' <br />ZYes []No [_�NA <br />F]Yes FINo ENA <br />Yes SN i�NA <br />RYes []No [--INA <br />Turbine shutdown response time <br />Is system programmed for fail-sa05 <br />shutdown?* <br />EYes []No E]NA <br />Elyes E]No NNA <br />IL <br />E]Yes E]No EINA <br />I []Yes EjNo EINA <br />Was fail-safe 1e_rifie1to be <br />operational? <br />1 RYes [:]No ONA 11� <br />[:]Yes MNo NNA <br />0Yes; RNo []NA <br />Wait time between applying <br />pressure/vacuumAvater and starti <br />test* <br />I <br />Test Start Time: <br />Initial Reading (Pl): W <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or Criteria:f <br />11 <br />1 Ii <br />Was sensor removed for testing? <br />04 9 M- <br />& Yes [No t�]NA-�100MElffEM, <br />Dyes E]No FINA <br />Was sensor properly replaced and <br />enfied functional after testing? J <br />—]N <br />MYes [_ o DNA <br />RYes FINo E]NA <br />1 []Yes E]No FlN A <br />]KYes *No [:INA <br />Comments — (Include information on repairs made prior to testing, and recommended follow-up for failed tests.) <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO", then the entire sump should be tested. (See SWRCB; LG -160) <br />