Laserfiche WebLink
SWRCB. January 2002 FINAL DRAFT <br />Test Method Developed By: 0 Tank Manufacturer Industry Standard El Professional Engineer <br />I El Other (Specify) I <br />Test Method Used: El Pressure ►vacuum ■Hydrostatic <br />El Other (Specify) <br />Test Equipment Used: 1• 30" lig Dial Gauge <br />i Equipment Resolution: 21/o@ Mid <br />7i` <br />Is Tank Exempt From Testing?' V- 01811m* <br />OYes MNo <br />Tank Capaci = A <br />Tank Material: Steeberglass <br />Tank Manufa turer: <br />Q <br />Product Stored: <br />Wait time between applying <br />pressure/vacuum/%vater and 10 min <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: 60 minutes <br />Change in Reading (RF -111): <br />Pass/Fail Threshold or Criteria: <br />'o I <br />AlFail <br />MYesE]No FINA <br />MEVMENUE <br />wyes ![NoEINA <br />Was sensor properly replaced and 50'Yes IffNo Iff NA-� <br />verified functional after testing? <br />[:]Ycs MNo [INA <br />FlYes [:]NoE]NA <br />EONRM� <br />This is an Emergency Generator Tank. <br />Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondM, <br />containment such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containme <br />testing. (California Code of Regulations, Title 23, Section 2637(a)(6)} I <br />