My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 14
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 2:35:55 PM
Creation date
6/3/2020 9:55:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 14
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 14.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />SWRCB, January 2002 FINAL DRAFT Page _1_ of 7 <br />X -TI MLI <br />Test Method Developed By: El Piping Manufacturer 0 Industry Standard Professional Engineer <br />El Other (Specify <br />Test Method Used: 0 Pressure 0 Vacuum El Hydrostatic <br />El Other (Specify) <br />Test Test Equipment Used: <br />1 11 C' <br />uipment Used: Dial G 7e <br />Equipment Resolution: <br />01 <br />2 ra. Md Scale <br />882-TFUDOI <br />FOS/FOR <br />Piping Run N <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />FRP <br />Piping Manufacturer: <br />Ameron <br />Piping Diameter: <br />4" <br />—12' <br />Length of Piping iiun: <br />Product Stored: <br />Diesel <br />Method and location of <br />pipin -run isolation:AA <br />Boot @ Sump. <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />Test Start Time: <br />2:13p <br />Initial Reading (111). <br />10.00" hg <br />Test End Time: <br />3:15p <br />Final Reading (RF): <br />10.00" lig <br />Test Duratiow. <br />62 minutes <br />—0.00" <br />Change in Reading (Re-Ri) <br />lig <br />Pass/Fail Threshold or <br />Criteria: <br />0.00" lig <br />Test Result <br />E]Pam E]Fail <br />E]Pass E]Fail <br />ElPass E)Fail <br />E]Pass E]Fail <br />4" Ameron FRP piping over common Steel FOR and—F-0- S--- piping. <br />i est of was pulled back alter testing was complete, <br />Vacuum testing was used, <br />
The URL can be used to link to this page
Your browser does not support the video tag.