Laserfiche WebLink
SWRCB, January 2002 FINAL DRAFT Page 4 of 7 <br />6. PIPING SUMP TESTING <br />---------- - <br />Test Method Developed By: Ej Sump Manufacturer 0 Industry Standard Professional Engineer <br />El Other (Specify) k <br />Test Method Used: El Pressure [_1 Vacuum Hydrostatic <br />Ej Other (Specify) <br />Test Equipment Used: Caldwell Sump Level Change Indicator <br />Equipment Resolution: 0.0025" <br />Sump # Sump # <br />882-TFUDOI <br />Sump Diameter: <br />j Sump Depth from Top of Tank: <br />Sump Material: <br />1kight from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Top <br />Lowest Electrical Penetration: <br />1Condition of sump prior to testingL <br />Depth of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />E]Yes EjNo UNA <br />s MINo EN <br />'a _YeX x <br />E]Yes ONo EINA <br />Elyes ONo EINA <br />p ater)?' <br />i L Turbine shutdown response time: :::i <br />Suction System <br />J Is system programmed for fail-safb6�� <br />shutdown?' <br />E]Yes DNo UNA <br />I E]Yes DNo DNA <br />nYes DNo DNA <br />1 OYes DNo DNA <br />Was fail-safe verified to be <br />E]Yes nNo UNA �111 <br />DYes []No DNA <br />[:]Yes DNo ■ <br />DYes ONo DNA <br />0 tional? <br />Wait time between applying <br />pressure/vacuuni/water and startin <br />test: <br />IL <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />20.25" <br />Test Duration: <br />P <br />-tinut <br />45 n es <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or Criteria: <br />Test Result <br />N -Pass DFai <br />Wass IRFail <br />Was senso removed for testing? <br />M s nNo EINA <br />DYes DNo DNA <br />E]Yes DNo RNA <br />o w4i <br />Yes■No DNA <br />ZO <br />[-]Yes EjNo EINA <br />NA No <br />Elyes E] ♦ [Jf <br />I V11r01W411N4=t*'1 <br />t.�Mi4#ff7Zg#TiiTit7.TiTirdLMLEEMP M <br />