My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 4:01:06 PM
Creation date
6/3/2020 9:55:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building 850 I Legend <br /> Original tank excavation <br /> Transformer —� �� ���' <br /> Excavated soil pile <br /> shelter ♦ Exposed copper piping <br /> — — — Approximate edge of road <br /> --------- Underground piping <br /> 0 Christy box <br /> U85"IM-25 • Exploratory borehole along piping <br /> W-850-05 Monitor well <br /> —► Down slope direction <br /> U850-D1 U1-25; • ®Metal stake before 1991 <br /> Scale : Feet <br /> 0 10 20 <br /> Asphalt road <br /> i U850-D1 U1-24 <br /> -———— •_ W-850-05 <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> 1 <br /> �\ <br /> Original tank—► <br /> excavation <br /> Final excavation - <br /> Excavated soil <br /> pile sampling — <br /> location / Gravel road <br /> I� <br /> I I <br /> r / <br /> Figure 1. Location of Building 850,850-D1U1 tank excavations, and boreholes along piping. <br />
The URL can be used to link to this page
Your browser does not support the video tag.