Laserfiche WebLink
,®:... ..°.spa..�:t::.s.,.w=c..e...�.s.t :.,..en."�n.>i^,:•x..-r<...*.®a.s. .'.a:_ ..�<. ..a..o ... -.i..cr.. .bF,. .d. rf,.�.. ...a ,...4.a.,—.,.. J_ ..� ...<a,... 2..r. . ...r x.,..,.. <br /> r ' . <br /> A. Underground Storage Tank: <br /> Clawson <br /> Buffalo Tank Corporation <br /> Modern Welding Co. <br /> B. Day Tank Fuel Transfer System: <br /> Tramont <br /> Pryco <br /> PART 3 - EXECUTION <br /> 3.01 Installation: <br /> A. Install the underground storage tank in accordance with manufacturer's <br /> instructions. <br /> B. Pressure test the underground storage tank at 5 prig air pressure prior to <br /> installation. Tank shall have no loss of pressure for one hour. <br /> C. Provide the plumbing connections between the day tank, underground <br /> storage tank and the diesel generator. Follow manufacturer's recom- <br /> mendations regarding pipe size, flex hose and final connection to engine <br /> supply. Verify that the maximum lift between the underground storage <br /> tank and the day tank does not exceed 171. <br /> D. Pressure test all fuel lines and double containment piping for leak-tight <br /> integrity. Pressure values are twice the operating pressure of transfer <br /> pumps selected. <br /> E. Verify that all valves are open and the installation is in accordance with <br /> the local building codes. <br /> F. Install control wiring associated with level gages, leak monitoring system <br /> and other controls and alarms per Division 16. <br /> END OF SECTION 15591 <br /> 21-AO96 15991-4 <br />