My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 10:55:40 AM
Creation date
6/3/2020 9:55:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 5
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,®:... ..°.spa..�:t::.s.,.w=c..e...�.s.t :.,..en."�n.>i^,:•x..-r<...*.®a.s. .'.a:_ ..�<. ..a..o ... -.i..cr.. .bF,. .d. rf,.�.. ...a ,...4.a.,—.,.. J_ ..� ...<a,... 2..r. . ...r x.,..,.. <br /> r ' . <br /> A. Underground Storage Tank: <br /> Clawson <br /> Buffalo Tank Corporation <br /> Modern Welding Co. <br /> B. Day Tank Fuel Transfer System: <br /> Tramont <br /> Pryco <br /> PART 3 - EXECUTION <br /> 3.01 Installation: <br /> A. Install the underground storage tank in accordance with manufacturer's <br /> instructions. <br /> B. Pressure test the underground storage tank at 5 prig air pressure prior to <br /> installation. Tank shall have no loss of pressure for one hour. <br /> C. Provide the plumbing connections between the day tank, underground <br /> storage tank and the diesel generator. Follow manufacturer's recom- <br /> mendations regarding pipe size, flex hose and final connection to engine <br /> supply. Verify that the maximum lift between the underground storage <br /> tank and the day tank does not exceed 171. <br /> D. Pressure test all fuel lines and double containment piping for leak-tight <br /> integrity. Pressure values are twice the operating pressure of transfer <br /> pumps selected. <br /> E. Verify that all valves are open and the installation is in accordance with <br /> the local building codes. <br /> F. Install control wiring associated with level gages, leak monitoring system <br /> and other controls and alarms per Division 16. <br /> END OF SECTION 15591 <br /> 21-AO96 15991-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.