My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 10:55:40 AM
Creation date
6/3/2020 9:55:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 5
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Accessories: <br /> A. Foot valve with strainer to maintain day tank pump prime in <br /> fuel oil tank suction tube. <br /> B. 5GPM hand pump with check valve and cut-off valve to help <br /> initialize prime on first start-up. <br /> C. Check valve in supply line to each day tank. <br /> D. An in-line filter or strainer. <br /> E. Vent cap. <br /> F. Rupture basin. 150% capacity of Day Tank. <br /> G. Float switch in rupture basin for alarm. <br /> H. Weather-proof cover required to prevent rainfall and debris <br /> from entering electrical and pumping unit. <br /> I. Weather-proof rupture basin. <br /> 5. Provide necessary fuel oil piping for interconnecting underground <br /> storage tank, day tank and Diesel Generators. Piping shall be black <br /> iron pipe, Schedule 40. Provide necessary double containment <br /> piping for all buried fuel oil piping. Double containment of piping <br /> shall be fiberglass or polyvinyl chloride. <br /> 6. Controls: <br /> A. Provide auxiliary contacts in the underground tank continuous <br /> monitoring system panel to transmit a common trouble <br /> alarm. <br /> B. Provide auxiliary contacts in the day tank control panel to <br /> transmit a common trouble alarm. <br /> C. Provide control wiring between the underground storage tank <br /> and the remote continuous leak monitoring system. <br /> D. Provide necessary tubing/control wiring for the remote liquid <br /> level gaging system. <br /> 2.02 Manufacturers: <br /> Subject to compliance with specified requirements, provide fuel oil system of <br /> one of the following, or equal: <br /> 21-AO96 15991-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.