Laserfiche WebLink
a <br /> NE ST INSTALLATION INSPECTIO 'CORD <br /> FACILITY NAME. <br /> SWEEPW • r�r, req t <br /> TAM ' tR! V L S TANK TERIAL: <br /> CAPACITY: l� ► QAS0uty t,, R.E.M.S: <br /> A I <br /> P M ALL TANKS TO BE INSTALLED AND TESTED IN A ANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> D S <br /> GATE STEM OR EQUIPMENT IMSPECTED <br /> 1. UST PLANSSUBMITTED/ FEES PAID CM+S CODE 25297, CCR 2635 (0) (8) <br /> 2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI: NRS/NIN: BRINECLIWID ): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: NRS/MIM: <br /> S. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL CC(tit 2635 (A) (3) (4) C6)/ API/PEID <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST CNINIMUM 40 PSI/30 MIN) (CCR Zm (B) (4)) <br /> 7. SECONDARY PIPING cmffAIHMENT TEST PSI: /MIN: . CCCR 2633 CA) (4)) <br /> 8. LAKE TEST ON ALL SUMPS C24 HR. Minimum) . CCCR CA)) <br /> 9. UNUSED TANK OPENINGS SEMM AND CORROSION PROTECTED <br /> ( ) <br /> 10. OVERSPILL PERFORgANCE TEST CCCR 205 CA) (4)) <br /> 11. ALL PIPING AND FITTINGS ION peMCTED CCCR 2635 Co)) <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR •ALL• MONITORING PRMS (CCR 2632 CC) C2)) <br /> 13. PERFORMANCE TEST OF CONTINUOUS MONITORING STSTEx (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFOVIAMCE TEST OF LINE LEAK OETECTICNN (CCR 2632 CO) 2635 CB) (5)) <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF CCCR 2635 (8) (5)) <br /> 16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br /> 17. OVERFILL PROTECTION INSTALLED/ (CCR 2635 CE) (2)) <br /> 15. TANK ACCESS PORTS BROUGHT TO GRADE CL Z AND WATERTIGHT) CCCR 2631 (0) (5)) <br /> 19. TANK INTEGRITY TEST CPASSIMG un COPY) (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 CE) (1) (2)) <br /> 21. •C• FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br /> 22. MONHITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641.2644) <br /> 23. ALL CONDITIONS MET; FACILITY PERMIT I (NI+S CODE 25284 (E) (F)) <br /> i <br /> -cQIIEHTS: <br /> EH23-•006 3/92 (REVISED 11\92) <br /> 8 <br />