Laserfiche WebLink
NEW LIINSTALLATION INSPECTION REWRI3 <br /> FACILITY <br /> ADDRESS: Y'•1"- 1��1 <br /> SWEEPS= T ` Utj U LSS TAMIL L/MATERIAL: 5 art <br /> PAAC,L.A S <br /> CAPACITY: SPRODUCT: Q7A U yy <br /> A I <br /> P M ALL TADS TO IME INSTALLED AND TESTED IM ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 1 <br /> V A <br /> E L <br /> 0 S <br /> OATS ITEM OR EQUIPMENT INSPECTED <br /> 1. UST PuttsSUBMITTED/ FEES PAID (INS CODE 25287, CCA 2635 (0) (a) <br /> 2. UST INSTALLATION PLANS APMM CCCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI: MRS/MIM: RRINE(LIQUIO ): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: MRS/MIM: <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED BACICFILL (CCR 2635 CA) (3) (4) c6)/ APt/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST CMININUK 40 PSI/30 NMN) CCCR 2435 CB) (4)) <br /> T. SECONDARY PIPING CONTAINMENT TEST PSI: /NIM: . (CCM 205 (A) C4)) <br /> 8. LAKE TEST ON ALL SUMn C24 He. MINIMUM) CCCR CA)) <br /> 9- UNUSED TANK OPENINGS SMED AND CORROSION PROTECTED ( ) <br /> 10. OVERSPILL PERFORMANCE TEST CCCR 2635 (A) (4)) <br /> 11. ALL PIPING AND FITTI 110M PROTECTED CCS 2435 ($)) <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR -ALL- MONITORING pv=S CCCR 2632 CC) (2)) <br /> 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (P ) CCCR 2632 CA) C2)) <br /> ti. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (0) 2635 (R) (5)) <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUP SYSTEM SNUT-OFF CCCR 2635 (N) (5)) <br /> 16. RAIL FLOAT VALVES INSTALLED CCCR 2635 (N) (6)) <br /> 17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 CE) (2)) <br /> 18. TANK ACCESS PORTS BROUGHT TO WADE CLOCKED AND WATERTIGHT) (CCR 2631 (0) (5)) <br /> 19. TANG INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPONSE PLAN AND LOG ROOK ON SITE (CCR 2632 (E) (1) (2)) <br /> 21. •C• FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br /> 22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED CCCR 26/.1.26") <br /> 23. ALL CODITIONS NET; FACILITY PERMIT ISSUED (NNS CODE 25284 (E) (F)) <br /> -�QMENTS: <br /> EM 3/92 (REVISED 11\92) <br /> ® 8 <br />