Laserfiche WebLink
TABLE OF CONTENTS <br /> BACKGROUND:......................................................................................................................................1 <br /> TANK/PIPING INFORMATION:.........................................................................................................1 <br /> EXCAVATION INFORMATION: .........................................................................................................2 <br /> ENVIRONMENTAL SAMPLE INFORMATION:...............................................................................3 <br /> SOIL....................................................................................................................................................3 <br /> WATER...............................................................................................................................................3 <br /> SUMMARY OF ENVIRONMENTAL SAMPLES COLLECTED:......................................................4 <br /> SUMMARY OF LABORATORY ANALYTICAL RESULTS:.............................................................4 <br /> PERSONAL PROTECTION EQUIPMENT(PPE)DISPOSAL: .........................................................7 <br /> CLOSURE REPORT CONCLUSIONS: .................................................................................................8 <br /> OTHEROBSERVATIONS: .....................................................................................................................8 <br /> APPENDIX A: COPY OF THE 879-G1U1&879-G2U1 APPROVED CLOSURE PLAN <br /> APPLICATION FOR UNDERGROUND TANK CLOSURE PERMIT................A-1 <br /> APPENDIX B: STRAIGHT BILLS OF LADING FOR USTs 879-G1U1 &879-G2U1 TANK <br /> CONTENTS..................................................................................................................B-1 <br /> APPENDIX C: LLNL HAZARDOUS WASTE DISPOSAL REQUISITIONS AND <br /> UNIFORM HAZARDOUS WASTE MANIFESTS FOR THE TANKS AND <br /> ASSOCIATEDPIPING...............................................................................................0-1 <br /> APPENDIX D: COPIES OF THE UNDERGROUND STORAGE TANK UNAUTHORIZED <br /> RELEASE(LEAK)/CONTAMINATION SITE REPORT FOR THE WATER <br /> RELEASE IN CLOSURE EXCAVATION OF TANKS 879-GlU1 &879-G2U1; <br /> and LLNL DISPOSAL OF NON-HAZARDOUS LIQUID LETTER with <br /> GIBSON LIQUID WASTE PROFILE SHEET..........................................................D-1 <br /> APPENDIX E: FIGURES&PHOTOGRAPHS OF CLOSURE ACTIVITIES FOR USTs <br /> 879-GlU1 and 879-G2U1........................................................................................... E-1 <br /> FIGURE 1: Sample locations for the closure of USTs 879-GlU1&879-G2U1 .........................................E-2 <br /> FIGURE 2: Sample locations from the soil piles for the closure of USTs 879-GlU1&879-G2U1.........E-3 <br /> PHOTOGRAPH 1: View of the relationshi of UST 879-G2U1 (fiberglass tank on left)and UST <br /> 879-G1U1(steel tank on rigght within the tank pit......:........................................................E-4 <br /> PHOTOGRAPH 2: View of UST 879-GlUl being mounted onto Erickson truck. Hold down <br /> strapsare beingg pplaced..............................................................................................................E-5 <br /> PHOTOGRAPH 3: View of UST 879-G2Ul being mounted onto Erickson truck. Hold down <br /> strapsare being placed..............................................................................................................E-6 <br /> PHOTOGRAPH 4: View of excavation after USTs 879-GlUl and-G2Ul have been removed............E-7 <br /> PHOTOGRAPH 5: View of soil sample being collected from backhoe bucket containing soil <br /> fromthe excavation pit..............................................................................................................E-8 <br /> PHOTOGRAPH 6: View of excavation depth being measured. Excavation soil sample was <br /> collectedfrom this depth.....:.....................................................................................................E-9 <br /> PHOTOGRAPH 7: View of additional soil being removed from the excavation...................................E-10 <br /> PHOTOGRAPH 8: View of additional soil being loaded into dump truck for temporary <br /> disposal into on-site soil stockpiles.........................................................................................E-11 <br /> PHOTOGRAPH 9: View of stockpiled soil covered with visqueen.:........................................................E-12 <br /> PHOTOGRAPH 10: View of asphalt stockpile from which composite samples were collected <br /> forradioactive analyses.............................................................................................................E-13 <br /> APPENDIX F: ANALYTICAL DATA&CHAIN OF CUSTODY RECORDS...............................F-1 <br /> APPENDIX G: CONSOLIDATED ENGINEERING LABS FIELD DENSITY REPORT...............G-1 <br /> APPENDIX H: CERTIFICATE OF TANK DESTRUCTION,ERICKSON,INC............................H-1 <br />