Laserfiche WebLink
�o <br />A <br />IT <br />Name of Supplier, Owner of Dealer <br />Address No. and Street(s) City <br />State Dae of Test <br />15. TANK Tn"iEST <br />16. CAPACITY <br />From <br />Byer <br />By most accuratef <br />Nominal Capacity_4L!::3� capacity chart ava ilable <br />Station Chart <br />Tank Manufacturer's Chart <br />'d7f tity by Position <br />Gallons Gallons <br />CJ Company Engineering Data <br />Is there doubt as to True Capacity❑ 7 <br />I j Charts supplied with <br />omen <br />Stand Grade <br />See Section "DETERMINING TANK CAPACITY" <br />1ANK TiSIM <br />j Other <br />17., FILL-UP,FOR JEST:�.� <br />P Stick Readings <br />7. Total Gallons <br />Stick Water Bottom, <br />to % in. Gallons ea. Reading <br />before <br />Inventory <br />to % in. <br />Gallons JJ <br />FIN, up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br />-0 — <br />00 <br />Tank Diameter <br />Product In full tank (up to fill pipe) <br />-M -01 b <br />:� q <br />G) 0 0 W -4 <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK <br />VAPOR RECOVERY SYSTEM <br />X X cl) <br />0 <br />0 > <br />See manual sections applicable. Check below and record procedure in log (26). <br />Stage I <br />-Zo <br />;R <br />r] water In tank High water table <br />In tank excavation Lines) being tested with LVLLT <br />Stage 11 <br />> 0 < <br />. 0M <br />0 <br />0 <br />21. TEMPERATURENOLUME FACTOR (a) TO TEST THIS TANK <br />�4 <br />19. TANK MEASUREMENTS FOR <br />r%) <br />Is <br />TSTT ASSEMBLY <br />Is Today Warmer? [ I Colder? F Product in Tank F Fill -up Product on Truck F Expected Change or <br />CnBottom <br />(0 <br />of tank to Grade* .................... <br />22. <br />Thermal -Sensor reading after circulation <br />-F <br />Add 30" for 4" L ................. <br />_—Z4i_7__ digits <br />Nearest <br />.,Add 24" for 3" L or air seal ....... <br />Total tubing to assemble Approximate ........ <br />23. Digits per *F In range of expected change <br />digits <br />L I <br />20. EXTENSION HOSE SETTING <br />X 0 // <br />24 . 11( 7 ,/- �n <br />= 1 C� <br />/2, gallons <br />Tank top to grade*..,; ............................ <br />Extend hose on suction tube 6" or more <br />total 4uantity in coefficient of expansion for <br />10 full tank (16 or 17) involved product <br />volume change in this tank <br />per *F <br />0 co) <br />below tank top ....................... ...... <br />1.2 -1 25. 0, Z,� <br />L 71 <br />......... . . ........ . ........ <br />This is <br />If Fill pipe extends above grade, use top of fill. <br />volume change per *F (24) Digits per 'F in test <br />Range (23) <br />Volume change per digit. test <br />Compute to 4 decimal places. factor (a) <br />26— <br />LOG OF TEST PROCEDURES <br />30. HYDROSTATIC <br />PRESSURE <br />31. VOLUME MEASUREMENTS (Y) <br />34� TEMPERATURE COMPENSATION <br />38. NET VOLUME <br />CHANGES <br />1139 ACCUMULATED <br />CONTROL <br />RECORD TO .01 GAL. <br />USE FACTOR (a) <br />EACH READING <br />CHANGE <br />27. <br />28. <br />29. <br />Standpipe Level <br />32. Product in <br />Prod <br />Product <br />35. <br />36. <br />37. <br />Temperature <br />I <br />At High Level record <br />IHaE <br />Record details of setting up <br />and running test. (Use full <br />Reading <br />in Inches <br />Graduate <br />Replaced <br />Thermal <br />Change <br />Higher + <br />Computation <br />(c) x (8) <br />Adjustment <br />Total End Deflection <br />Volume Minus <br />length of line if needed.) <br />Beginning <br />of <br />Level to <br />which <br />Sensor <br />Reading <br />Lower - <br />(C) <br />Expansion + <br />Contraction - <br />Expansion (+) of <br />Contraction (-) <br />At Low Level Compute <br />Change per Hour <br />—TIME <br />Before <br />After <br />Product <br />(24 hr.) <br />Reading <br />Restored <br />Reading <br />Reading <br />Recovered <br />#33(V) -#37(T) <br />(NFPA criteria) <br />�o <br />t. <br />IT <br />sd I <br />h <br />4 <br />4- <br />4� -3 <br />�o <br />