Laserfiche WebLink
M <br />O <br />30. HYDROSTATIC <br />PRESSURE <br />CONTROL <br />total quantity in <br />to <br />4 <br />19. TANK MEASUREMENTS FOR <br />involved product <br />27. <br />BATE <br />• <br />14. <br />volume change per °F (24) <br />Bottom of tank to Grade* ........ <br />C <br />35. <br />Thermal <br />Sensor B <br />Reading <br />Add 30" for 4" L ..... <br />t'O? _ <br />Temperature <br />P <br />Adjustment <br />Add 24" for 3" L or air seal . <br />Name of Supplier, Owner or Dealer Address No, and Streets) City <br />State <br />Date of Test <br />At Low Level compute <br />Chang e per Hour <br />INFPA criteria) <br />� <br />Before <br />Reading <br />20. EXTENSION HOSE SETTING <br />15. TANK TO T ST. <br />16. CAPACITY <br />From <br />Tank top to grade`....,.;.. .... <br />n <br />/ <br />GFr r' <br />L Station Chart <br />below tank top t, „, <br />m <br />- --- <br />.rte <br />If Fill pipe extends above grade, use top of fill. <br />C' By most accurate ! <br />4 ^- 1, ) <br />Nominal Capacity ,, r capacity chart available <br />=c -'' <br />6 { Tank Manufacturer's Chart <br />r!� <br />Identity by positron t <br />Gallons <br />Is there doubt as to True Capacity t ❑ <br />talions <br />Company Engineering Data <br />trA <br />ItP <br />� -� Charts supplied with �' 1 <br />n u rtsnv <br />h <br />stand and Grade <br />See Section "DETERMINING TANK CAPACITY" <br />l . l <br />Other -_ <br />17. FILL -UP FOR TEST -< "° <br />Stick Readings <br />Total Gallons <br />to 1/9 in. <br />Gallons ea. Reading <br />Stick Water Bottom <br />`! <br />7 <br />before Fllhup Inventory <br />< i ✓ <br />to % in. . " Gallons <br />/ <br />FIN up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br />o <br />Tank Diameter Product In full tank (up to fill pipe)" <br />- <br />,— j —. 7 <br />'^ -0— <br />V <br />0 <br />P10% <br />r 0 . <br />G) p -4 <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK <br />VAPOR RECOVERY SYSTEM <br />0 A <br />See manual sections applicable. Check below and record procedure in log (26). <br />stage I <br />❑Z <br />O <br />Water in tank High water table in tank excavation ❑ Line(s) being tested with LVLLT <br />. -//Bp�r <br />Stage II <br />D <br />�t� <br />r,� <br />M <br />O <br />30. HYDROSTATIC <br />PRESSURE <br />CONTROL <br />total quantity in <br />to <br />4 <br />19. TANK MEASUREMENTS FOR <br />involved product <br />27. <br />BATE <br />• <br />TETT ASSEMBLY <br />volume change per °F (24) <br />Dr <br />Bottom of tank to Grade* ........ <br />C <br />35. <br />Thermal <br />Sensor B <br />Reading <br />Add 30" for 4" L ..... <br />t'O? _ <br />Temperature <br />P <br />Adjustment <br />Add 24" for 3" L or air seal . <br />Level to <br />which <br />Restored <br />Total tubing to assemble Approximate .... <br />At Low Level compute <br />Chang e per Hour <br />INFPA criteria) <br />� <br />Before <br />Reading <br />20. EXTENSION HOSE SETTING <br />Product <br />Recovered (+) <br />TIME <br />li4 IwJ <br />rr <br />Tank top to grade`....,.;.. .... <br />Extend hose on suction tube 6 or, more <br />/ <br />GFr r' <br />below tank top t, „, <br />- --- <br />.rte <br />If Fill pipe extends above grade, use top of fill. <br />21. TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK <br />Is Today Warmer? I I Colder? I 1 _—° F Product in Tank ._ ° F Fill -up Product on Truck —° F Expected Change ( + or - ) <br />22. Thermal -Sensor reading after circulation / { r "' °F <br />digits Nearest <br />23• Digits per °F in range of expected change <br />digits <br />24. <br />30. HYDROSTATIC <br />PRESSURE <br />CONTROL <br />total quantity in <br />coefficient of expansion for <br />full tank (16 or 17) <br />involved product <br />27. <br />BATE <br />• <br />28. <br />Record details of settingU p <br />and running fast. (Use full <br />length of line if needed.) <br />volume change per °F (24) <br />Digits per °F in test <br />32. product in <br />Graduate <br />Range (23) <br />/,, 0!� 7,"? , ailons <br />'9 <br />volume change in this tank <br />per <br />°F (. 0 I��� <br />. ,A r' 2 (, a t_( i_, This is <br />Volume change per digit. test <br />Compute to 4 decimal places. factor (a) <br />26. <br />- LOG OF TEST PROCEDURES <br />30. HYDROSTATIC <br />PRESSURE <br />CONTROL <br />31. <br />VOLUME MEASUREMENTS IVI <br />RECORD TO .001 GAL. <br />34. <br />TEMPERATURE COMPENSATION <br />USE FACTOR (a) <br />38. NET VOLUME <br />CHANGES <br />EACH READING <br />39• <br />ACCUMULATED <br />CHANGE <br />27. <br />BATE <br />• <br />28. <br />Record details of settingU p <br />and running fast. (Use full <br />length of line if needed.) <br />29. <br />Reading <br />No. <br />Standpipe Level <br />- in Inches <br />32. product in <br />Graduate <br />Product <br />Replaced (-) <br />35. <br />Thermal <br />Sensor B <br />Reading <br />36. <br />Change <br />Higher + <br />B <br />Lower - <br />(c) <br />37. <br />(amputation <br />>r a <br />IN 1 i = <br />Expansion + <br />Contraction - <br />Temperature <br />P <br />Adjustment <br />At Nigh level record <br />Total End Deflection <br />Beginning <br />of <br />floading <br />Level to <br />which <br />Restored <br />Volume Minus <br />Expansion (+) or <br />Contraction (--) <br />M33(V)— r37(T) <br />At Low Level compute <br />Chang e per Hour <br />INFPA criteria) <br />� <br />Before <br />Reading <br />After <br />Reading <br />Product <br />Recovered (+) <br />TIME <br />li4 IwJ <br />A f <br />, <br />- --- <br />------ <br />Zoo <br />ao <br />. -//Bp�r <br />+-,ops- <br />� -� >� <br />�t� <br />r,� <br />C) s <br />� ���b <br />Y <br />4- •o7,77 <br />.: <br />— <br />t <br />-71 <br />a' . <br />t 7� <br />�° � <br />-• , <br />or <br />� k <br />t ' <br />s <br />p / <br />ear7 <br />+ <br />t <br />I <br />- , <br />r <br />tz� <br />160 <br />s"s <br />.o <br />-, 7s <br />f 3 <br />4-, q; <br />40 <br />4- <br />r <br />I <br />©�O <br />+ R z <br />of <br />j <br />vmUAND <br />