My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_1986-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:51:48 AM
Creation date
6/3/2020 9:56:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2001
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_1986-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 UNDERGROUND TANK INSPECTION RECORD <br />NEW TANK INSTALLATION <br />SITE NAME Z2 (01 L INSPECTOR'S NAME <br />—ADDRESS 1403 C(-UF� BLVD9 CITY 5'l X_61'n21P g52.n—�-- <br />CONTRACTOR: NAME ► ' aZn L(j W QS -V= 8 ki PHONE_— <br />OWNER: NAME -5.F. O i L PHONE <br />//G� <br />DIS <br />INSPECTOR'S <br />INITIAL INSPECTION <br />i. UL numbers 3�G5OA tank size ��0 00� �`^'vo <br />DATE <br />kPPROVED <br />PPROVED <br />INITIALS <br />. Tank tested upon delivery [Holiday (plasteel) or air at 5 PSI (FRP)) <br />nqi <br />3. Overfill protection Installed, describe: ! 1 _ ati !� <br />ITEM OR EQUIPMENT INSPECTED <br />l <br />4. Unused tank opening sealed and cathodically protected. nU Ud10SP 7 <br />1. Fees paid <br />'L it <br />l <br />------ <br />6. Monitoring ports in place and brought to grade. (lockable weather proof covers) <br />. Plans Approved <br />//G� <br />V <br />(PING STAGE INSPECTION 19- �j `7�,/ 2 o.: 0-,, -, <br />1. Pressure test of piping. (Primary and Secondary (NEPA 30)) <br />INITIAL INSPECTION <br />i. UL numbers 3�G5OA tank size ��0 00� �`^'vo <br />Al <br />er� <br />2. Ball float valves installed. <br />. Tank tested upon delivery [Holiday (plasteel) or air at 5 PSI (FRP)) <br />nqi <br />3. Overfill protection Installed, describe: ! 1 _ ati !� <br />. Visual inspection of secondary containment. <br />l <br />4. Unused tank opening sealed and cathodically protected. nU Ud10SP 7 <br />. Tank appropriately placed with approved backfill. <br />//G� <br />V <br />(PING STAGE INSPECTION 19- �j `7�,/ 2 o.: 0-,, -, <br />1. Pressure test of piping. (Primary and Secondary (NEPA 30)) <br />FINAL INSPECTION <br />1. Precision test successfully completed and hard copies received. (NFPA 329) <br />Al <br />er� <br />2. Ball float valves installed. <br />2. Spill protection at fill pipe. <br />vy r� <br />qv � 1\1 <br />3. Overfill protection Installed, describe: ! 1 _ ati !� <br />3. Performance test of overfill protection system. <br />(2 <br />4. Unused tank opening sealed and cathodically protected. nU Ud10SP 7 <br />U) V <br />5. Visual inspection of secondary containment on piping. °-P kt <br />l <br />------ <br />6. Monitoring ports in place and brought to grade. (lockable weather proof covers) <br />Q <br />7. Fill and vent piping brought to grade. <br />6. Permit to operate application complete. <br />8. Product line leak detector in place. (Hard wired) <br />7. Acceptable recordk6eping system. <br />Ali r� <br />9. Approved tank leak monitoring device installed. <br />�✓✓ <br />10. All galvanized piping and fittings properly wrapped. 7 <br />11' Pressure decay test on complete tank and product delivery system. <br />//G� <br />�j( <br />q V "� <br />FINAL INSPECTION <br />1. Precision test successfully completed and hard copies received. (NFPA 329) <br />Al <br />2. Spill protection at fill pipe. <br />Cn((% <br />3. Performance test of overfill protection system. <br />(2 <br />4. Performance test of product line teak detector. (Hard wired) <br />/ Gil <br />l <br />l✓ �� <br />5. Performance test of continuous monitoring system(s) on tank (s) <br />6. Permit to operate application complete. <br />7. Acceptable recordk6eping system. <br />Comments: <br />EN 23 006 10/89 _- --- <br />
The URL can be used to link to this page
Your browser does not support the video tag.