My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_1986-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:51:48 AM
Creation date
6/3/2020 9:56:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2001
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_1986-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND TANK INSPECTION RECORD <br />NEW TANK INSTALLATION <br />t Y <br />SITE NAME �5147 01 L INSPECTOR'S NAME' / <br />_._ADDRESS 1405 i�.auhn�. 51 5LVD. CITY S'li�C�'j't�t zip C15 <br />CONTRACTOR* MA14E ISO akIS YZ.L IOkf PHONE <br />OWNER: NAME _J.i� ® i L PHONE <br />I qi <br />1PlNG STAGE INSPECTION � 0— i 7yl <br />1. Pressure test of piping. (Primary and Secondary (NFPA 30)) <br />DIS <br />INSPECTOR'S <br />INITIAL INSPECTION <br />1. UL numbers ;31:lqqA tank size <br />DATE <br />PPROVED <br />PPROVED <br />INITIALS <br />. Tank tested upon delivery [Holiday (plasteel) o air at 5 PSI (FRP)j , <br />iql41. <br />4. <br />Unused tank opening sealed and cathodically protected. <br />ITEM OR EQUIPMENT INSPECTED <br />)4 'q <br />6. Permit to operate application complete. <br />6. <br />1. Fees paid <br />7. Acceptable recordkceping system. <br />7. <br />Fill and vent piping brought to grade. <br />F. Plans Approved <br />I qi <br />1PlNG STAGE INSPECTION � 0— i 7yl <br />1. Pressure test of piping. (Primary and Secondary (NFPA 30)) <br />FINAL INSPECTION <br />I. Precision test successfully completed and hard copies received. (NFPA 329) <br />2. <br />INITIAL INSPECTION <br />1. UL numbers ;31:lqqA tank size <br />2. Spill protection at fill pipe. <br />3. <br />Overfill protection installed, describe: kto�} a-,C5no n _ <br />3. Performance test of overfill protection system. <br />. Tank tested upon delivery [Holiday (plasteel) o air at 5 PSI (FRP)j , <br />iql41. <br />4. <br />Unused tank opening sealed and cathodically protected. <br />Visual inspection of secondary containment. <br />)4 'q <br />6. Permit to operate application complete. <br />6. <br />. Tank appropriately placed with approved backfill. <br />/ <br />1PlNG STAGE INSPECTION � 0— i 7yl <br />1. Pressure test of piping. (Primary and Secondary (NFPA 30)) <br />FINAL INSPECTION <br />I. Precision test successfully completed and hard copies received. (NFPA 329) <br />2. <br />Ball float valves Installed. r,,1 <br />2. Spill protection at fill pipe. <br />3. <br />Overfill protection installed, describe: kto�} a-,C5no n _ <br />3. Performance test of overfill protection system. <br />4. <br />Unused tank opening sealed and cathodically protected. <br />5. <br />Visual Inspection of secondary containment on piping. 56,q {� k <br />6. Permit to operate application complete. <br />6. <br />Monitoring ports in place and brought to grade. (lockable weather proof covers) <br />7. Acceptable recordkceping system. <br />7. <br />Fill and vent piping brought to grade. <br />8. <br />Product tine leak detector in place. (Hard wired) <br />9. <br />Approved tank leak monitoring device installed. G� <br />10. <br />All galvanized piping and fittings properly wrapped. 2 <br />11 <br />Pressure decay test on complete tank and product delivery system. <br />/ <br />FINAL INSPECTION <br />I. Precision test successfully completed and hard copies received. (NFPA 329) <br />2. Spill protection at fill pipe. <br />QU �✓ <br />3. Performance test of overfill protection system. <br />4. Performance test of product line leak detector. (Hard wired) <br />5. Performance test of continuous monitoring system(s) on tank (s) <br />6. Permit to operate application complete. <br />7. Acceptable recordkceping system. <br />FN 23 006 10/89 - -- <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.