Laserfiche WebLink
Kasey Foley <br />October 26, 1990 <br />Page 2 <br />Item 5: Red Jacket PPM 2000 is the complete monitoring <br />system for the fuel tanks and piping (See attached <br />brochure) <br />It is UL listed. <br />It monitors both the piping sump and annular space. <br />The unit includes Red Jacket probes. <br />The probes detect vapor and liquid. <br />Item 6: See attached copy of Pomeco 211 containment sump. <br />MOTOR OIL & WASTE OIL TANKS <br />Item 1: Secondary containment of vent piping not required <br />due to automatic over fill device (ball check valve) <br />on vent line, per Doug Wilson 8/8/90. <br />Item 2: Fill/spill containment box - CNI-239-264 <br />See DWG 15 -R -CA, Material Schedule, Item 1 <br />Item 3: Red Jacket PPM 2000, located in the bay building <br />(See brochure) <br />Item 4: Automatic shut off on the fill is not available for <br />motor oils. Due to viscosity the shut off device <br />typically used for fuels will not perform in thick <br />motor oils. We will install flexible dipstick <br />monitoring system. <br />Item 5: <br />ALL TANKS <br />Item 1: <br />Item 2: <br />CLOSURE PLAN <br />Item 1: <br />Double wall piping to be installed on all product <br />piping tank sump to the stub pump inside the lube <br />building. Shown on Site Plan. <br />See attached letter and list of contractors which <br />will bid on this project. <br />See attached copy Response Plan. <br />Shown on revised Closure Plan (attached) <br />