Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN — (Pae 1 of 2) <br />TYPE OF ACTION ❑ I NEW PLAN CS 2 CHANGE OF INFORMATION 490-1 <br />PLAN TYPE ❑ 1 MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY 490-2 <br />(Check one item only) ❑ 2 THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />l <br />BUSINESS NAME (Same as Facility Name or DBA) a <br />CRL -C t a75-gq(o <br />BUSINESS TE WU S CM9 B VCL to3 <br />(,/ /�� <br />CI [y , W�0 toa <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e g, sensors, probes, line leak detectors, etc ) must be performed at the frequency specified <br />b the equipment manufacturers instructions, or annually, whichever 1s more frequent. Such work must be performed by qualified personnel [23 CCR §2632 2634 2638, 26411 <br />_y 4000 - ._...._ whichever ._.._. _ -- — _ .__ _ . <br />MONITORING EQUIPMENT IS SERVICED ❑1. ANNUALLY ❑ 490-3a <br />99. OTER ( ecify): 490-3b. <br />III. MONITORING LOCATIONS <br />❑ 1 NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2 SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR §2632.2634] 4904 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hatak ) <br />❑ 1 CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) 490-5 <br />WITH AUDIBLE AND VISUAL ALARMS (23 CCR §2632,26341 <br />SECONDARY CONTAINMENT 1S: ® a DRY4b LIQUID FILLED ❑ c PRESSURIZED d UNDER VACUUM 490.6 <br />PANEL MANUFACTURER: 490-7 MODEL #: -FLS 490-8 <br />-FLS <br />LEAK SENSORMANUFACTURER: 490-9 MODEL #(S): 490.10 <br />_._ 4..4..400000-. .00000000---0000-- <br />❑ 2 AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) [23 CCR §2643] 490.11 <br />PANEL MANUFACTURER: 490-12 MODEL #: 490.13 <br />IN -TANK PROBE MANUFACTURER: 490-14 MODEL #(S): 490-15 <br />LEAK TESI FREQUENCY: ❑ a CONTINUOUS ❑ b DAILY/NIGHTLY ❑ c WEEKLY 490-16 <br />❑ d MONTHLY ❑ e OTHER (Specify): 490-17 <br />490-18 <br />907[. _- <br />PROGRAMMED TESTS: ❑ a_0 l p h D b. 0 2 g.p,h ❑ c OTHER (Specify). _ 4.9.071.9-20 <br />❑ 3, MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §26461] a90•zo <br />❑ 4 WEEKLY MANUAL TANK GAUGING (MTG) [23 CCR §2645] TESTING PERIOD: ❑ a. 36 HOURS [Ib 60 HOURS 492-z1 <br />- 490-22. <br />_-_`. _.. .........__ 44.4...4........ _.....•._ _-.._._._ __ _.. _ _.-..__ . _._ _. _.__ _. -_.. - ... __._... _._. . ......_.. _... ........ ..4400---.. _._._ ..._--- _._ <br />❑ 5 TANK INTEGRITY TESTING PER [23 CCR§2643 11 490-23 <br />490-24 <br />TEST FREQUENCY: a ANNUALLY ❑ b BIENNIALLY ❑ c OTHER (Specify): 490.25 <br />❑ 99. OTHER (Specify):490-27. -27. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) "he"apply) <br />❑ 1 CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS 490.28 <br />(13DRY El LIQUID FILLED El PRESSURIZED ❑ d. UNDER VACUUM ago -z9 <br />SECONDARY CONTAINMENT IS:^^ <br />1a1 <br />PANEL MANUFACTURER: C.Ca� 490.30 MODEL #: Z_S SSS 490-31 <br />LEAK SENSOR MANUFACTURER: 490-32 MODEL #(S): 490-33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i c, TURBINE) SHUTDOWN ❑ a YES ❑ b NO 490-34 <br />FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b NO 490-35 <br />--------.. _.... .. _ ._---- -0000-- � --- 0000- -----...4.4.44..__....._ ...4..000--.._... <br />❑ 2 MECHANICAL LINE LEAK DETECTOR (MELD) THAT ROUTINELY PERFORMS 3 0 g p h LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36 <br />PRODUCT FLOW WHEN A LEAK IS DETECTED [23 CCR§26361 <br />MELD MANUFACTURER(S): 490.37 � MODEL #(S): 490-38 <br />_...._ 4 0000 0 00--000..4 <br />._ <br />❑ 3 ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUIINELY PERFORMS 3 0 g p h LEAK TESTS [23 CCR§2636] 490-39 <br />ELLD MANUFACTURER(S): 490-40 MODEL #(S): 49041 <br />PROGRAMMED IN LINE LEAK TEST: ❑ a MINIMUM MONTHLY 0 2 g p h ❑ b MINIMUM ANNUAL 0 1 g p h 490.42 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a YES ❑ b NO 490-43 <br />ELLD FAILURE/DISCONNECTIONTRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a. YES ❑ b NO 490.44 <br />_.... _ ..44...4.4 _...__ - -.,._..... __ .. _... ._.. .. . _ ........-._. <br />❑ 4 PIPE INTEGRITY TESTING 49045 <br />0-46 <br />TEST FREQUENCY: ❑ a- ANNUALLY ❑ b. EVERY 3 YEARS ❑ c OTHERS ci 497 <br />Q--.. (. >.. 4..490 <br />_.. ..._. ...... _.._.-...-_-._._.---.-__............_...__............. __..._. .... .-'_--_._. -_ <br />0000 __... _ _ ._ --- __ - <br />❑ 5 VISUAL PIPE MONITORING d90 -de <br />FREQUENCY: ❑ a DAILY ❑ b WEEKLY ❑ c MIN MONTHLY & EACH TIME SYSTEM OPERATED. 490-49 <br />• Allowed for mnitoring c f unburied,emergency generator fuel piping mly_per HK§252915 bL(3) <br />..___..-._ __.-4.4...4.4__...... ...._.... _.._ ._... __..--_...._.. ._- _. ..4444-_ _.... __. ..4.4.44 ..._....--- <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA(23 CCR §2636(a)(3p 490-50 <br />- <br />❑ T NO REGULATEDPIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490.51 <br />4444_. _..._... 4...4 00 ....... ......._.. __... <br />❑ 99. OTHER (Specify) 490.52 <br />490-53. <br />UPCF UST -D (12/2007) - 1/4 www.unidocs..org <br />