My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:36:29 AM
Creation date
6/3/2020 9:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN — (Page 2 of 2 <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING hat <br />that <br />1 <br />apply) <br />UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />I CONTINUOUS ELECTRONIC MONITORING ❑ 2 FLOAT AND CHAIN ASSEMBLY ❑ 3 ELECTRONIC STAND-ALONE <br />490-546 <br />❑ 4. NO DISPENSERS ❑ 99. OTHER (S ecify) <br />LEAK MONITOR MANUFACTURER: wagrR` - 41 -ss MODEL #: <br />490-54b <br />49656 <br />49657 MODEL #(S): 96,S <br />LEAK SENSOR MANUFACTURER: y OAer T<WV <br />490-511 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b NO <br />490-59 <br />UDC LEAK ALARM TRIGGERS AUIOMATIC PUMP SHUIDOWN ❑ a YES ❑ b. NO <br />490-60 <br />FAILURE/DISCONNECTION OF UDC MONIIORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a YES ❑ b NO <br />490-61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT IHE DISPENSER [Ia. YES ❑ b NO <br />490-62 <br />UDC CONSTRUCTION IS: 1 SINGLE WALL ❑ 2 DOUBLE WALL <br />490-63 <br />IF DOUBLE WALL: <br />490.64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a LIQUID ❑ b PRESSURE ❑ c VACUUM <br />A LEAK WITHIN THE SECONDARY CONIAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a. YES ❑ b. NO <br />490.641 <br />VII. PERIODIC SYSTEM TESTING' <br />❑ I ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65 <br />LEAK DETECTION MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. f23 CCR §2644.1] <br />® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />490-66 <br />® 3. SPILL BUCKETS ARE TESTED ANNUALLY. <br />490-67 <br />VIII. RECORD KEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />49669 <br />® a ALARM LOGS M b VISUAL INSPECTION RECORDS ❑ c TANK INIEGRITY TESTING RESULTS <br />❑ d SIR TESTING RESULTS (and supporting documentation records) ❑ e TANK GAUGING RESULTS (and supporting documentation records) <br />❑ f ATG TESTING RESULTS (and supporting documentation records) ❑ g CORROSION PROTECTION 60 -DAY LOGS <br />® h. EQUIPMENT MAINTENANCE AND CALIBRAIION RECORDS <br />IX TRAINING <br />® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: <br />490-69a <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />490.69b <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />490-69c <br />�j CALIFORNIA UNDERGROUND STORAGE IANK REGULAIIONS <br />490-69d <br />C1 CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />490-69e <br />® STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR IANK OWNERS - MANUAL AND <br />49669f <br />STATISTICAL INVENTORY RECONCILIATION" <br />SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br />490-69g <br />[3OTHER (Specify): <br />490.69h <br />490-69i. <br />® This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />490-70 <br />(ICC) The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 <br />days of hire This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />➢ The facility employee's role with regard to spills and overfills as specified in the facility's USI Response Plan. <br />➢ Name(s) of contact person(s) for emergencies and monitoring alarms <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan <br />490-71 <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: I ) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br />by this plan occurs. 2) all conditions that indicate apossible release are investigated; and.3 ) all monitoring records are maintained prg2SOy. <br />- .__.. <br />THE FOLLOWING PERSON(S) ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br />NAME: TWV(— 490.72 TITLE: <br />490.73 <br />NAME: eCgoice490.74 TITLE: A6& <br />49675 <br />The Designated UST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator <br />of any <br />conditions that need follow-up action. <br />XIL OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I r1ify tha e-ijifortnafi provid ein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE <br />DATE: <br />490-77 <br />/ <br />^` <br />REPRESENTING: ❑ 1. Tank Owner rator ❑ 2. Fa i weer/ erator 3. Authorized Re resentative of Owner 490-76. <br />APPLICANT NAME (print)- 49°-7s <br />SAk <br />APPLICANT TITLE: /1 ��§ <br />IMclv�a 2►'o 1t���o <br />a9°a9 <br />. <br />i0�vi 1st ►I IQts't�. <br />UPCF UST -D (12/2007) -3/4 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.