My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:36:29 AM
Creation date
6/3/2020 9:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />• <br />CNI Manufacturing Installation, Operation and Maintenance Manual (IOM) <br />Applicable to Executive Order VR -1 04-D <br />Belleau <br />Buna N,ruby <br />Spill container <br />oval <br />(K) <br />5/16"-18 X 1 1'/4" <br />Hex head Molts <br />Qty. 6 <br />(p3.1) <br />(TOP <br />Compression ging <br />Spill <br />container <br />T T f '_Ottorn <br />I (P3.2) <br />NOTE: The spill containment assembly is pre -assembled for ease of installation as shown above. <br />(Components of CON2-31103 are listed in the Exhibit 1 checklist contained in this Manual.) <br />3) Install Preassembled Product Containment Assembly (CON2-31103) <br />a) Apply a Teflon®, Fire Marshall approved thread sealing compound on the upper male threads of <br />the 4 inch riser pipe. <br />b) Manually tighten the complete product containment assembly (CON2-31103) (Fig. P3) onto the <br />4 inch riser pipe. <br />c) Use either the CNI Mfg. Containment Installation/Removal Tool (p/n EVRSYS116), or a chain <br />wrench with offset, and torque the oval flange onto the 4 inch product riser pipe to the value <br />specified in Table 1. . . <br />(NOTE: If the spill container must be removed from the oval flange in order to properly torque the <br />flange onto the 4 inch tank riser proceed to following steps i, ii, and iii.) <br />i) Inside the spill container there are six (6) hex head bolts and a compression ring that must <br />be removed (See Fig. P3.1). Once removed, lift the spill container to expose the oval flange. <br />ii) If using the CNI Mfg. Containment Installation/Removal Tool (p/n EVRSYS116) torque the <br />containment assembly and oval flange onto the 4 inch riser to the value specified in Table 2. <br />If a chain wrench with an offset is used, torque the oval flange onto the 4 inch tank riser to <br />the value specified in Table 2. <br />iii) Line up the spill containment assembly on the oval flange, and then align the compression <br />ring with the holes in the oval flange (See Fig. P3.2) and manually tighten the six hex head <br />bolts. Torque a little at a time in a cross over pattern for a correct seal, until you achieve <br />15 foot-pounds for each bolt each time (See Fig. P3.1). <br />15627 ARROW HIGHWAY, IRWINDALE, CALIFORNIA 91706 <br />PHONE (626) 962-6646; OUT OF STATE CALLS (800) 4CNI-MFG; FAX (626) 962-4854 30 <br />WEBSITE: WWW.CNI-MFG.coM EMAIL: INFOCCDCNI-MFG.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.