Laserfiche WebLink
SWRCB,January 2002 Page 5. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard X❑ Professional Engineer <br /> 0 Other (Specify) <br /> Test Method Used: F] Pressure ❑ Vacuum xI Hydrostatic <br /> Other (Spec) <br /> Test Equipment Used: VPLT Equipment Resolution: VPLT TO GPH <br /> ISuwmSump# 2 REG Sump# 1 REG Sump# 3 SUP Sump# 1 REG <br /> p <br /> 48" 48" 48" 4211 <br /> 43" 45" 45" 64"Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS <br /> Height from Tank Top to Top of 2911 24" 15" 4711 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 1611 161, 1611 3011 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: GOOD GOOD GOOD GOOD <br /> Portion of Sump Tested: 1 3111 2611 17" 4911 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both —71 XJYes❑NoON EYes F]NoON MYes ONo[_ Yes❑No�T <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 S E C 2-5 SEC 2-5 SEC 2-5 S EC <br /> Is system programmed for fail-safe ❑Yes ❑ o ❑ <br /> Yes No❑N N X � X X <br /> shutdown?* <br /> Was fail-safe verified to be ❑ ❑ ❑ ❑ ❑ ❑ ❑ [:] <br /> operational?* X Yes N N X Yes N N X Yes N N X Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5MIN 5MIN 5MIN 5MIN <br /> test: <br /> Test Start Time: 14 :08 11:24 10:21 12 :24 <br /> Initial Reading(R1): 7.713 10.236 6.021 4.573 <br /> Test End Time: 14:38 11:54 10:51 12 :54 <br /> Final Reading(RF): 7.713 10.132 5 .627 4.573 <br /> Test Duration: 3 0MIN 3 0MIN 3 0MIN 3 0MIN <br /> Change inReading(RF-R1 ): .000gph .008gph .03gph .000gph <br /> Pass/Fail Threshold or Criteria: .05gph .05gph .05gph .05gph <br /> Was sensor removed for testing? X YesoNoE]NA�YesE]NoE]NA 2 Yes N NA EYes D_NoF]N <br /> Was sensor properly replaced and NA ❑Ye�N�NA ❑Yes0 N�NAo Yes❑ <br /> N <br /> verified functional after testing? ❑Ye N X <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />