Laserfiche WebLink
SWRCB,January 2002Page 4 <br /> I is 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X❑ Tank Manufacturer ❑ Industry Standard Professional Engineer <br /> 0 Other (Spec) <br /> Test Method Used: M Pressure Vacuum Hydrostatic <br /> El Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> MEN= Piping Run# 3 SUP Piping Run# Piping Run# Piping Run# <br /> Piping Material: fiberglass <br /> Piping Manufacturer: smith <br /> Piping Diameter: 311 <br /> Length of Piping Run: 2 0' <br /> Product Stored: SUPREME <br /> Method and location of sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min <br /> starting test: <br /> Test Start Time: 10 :59 <br /> Initial Reading(F4 ): 3 PS I <br /> Test End Time: 11:59 <br /> Final Reading(RF ): 3 PS I <br /> Test Duration: 1HR <br /> Change in Reading(RF-14 ): 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />