My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:16:11 AM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility: Hammer 1-5 Arco <br />In -Tank Gauging / SIR Equipment: <br />®Check this box if tank gauging is used only for inventory control and disregard the following section. <br />❑Check this box if no tank gauging or SIR equipment is installed. <br />rmmnla+a *ha fnllnwinn rharklic+- <br />❑Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground <br />faults? <br />El Yes <br />❑ No* <br />Were all tank -gauging probes visually inspected for damage and residue buildup? <br />❑Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />El Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />El Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />G. Line Leak Detectors (LLD): <br />❑ Check this box if LLDs are not installed and disregard the following section. <br />®Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD <br />❑ N/A <br />performance? (Check a// that app/y) Simulated leak rate: ® 3 gph; ❑ 0.1 gph; ❑ 0.2 gph. <br />®Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />®Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />®Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />El Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® N/A <br />❑Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />® N/A <br />is disabled or disconnected? <br />❑Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />® N/A <br />malfunctions or fails a test? <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />[7Yes <br />N/A <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: No Deficiencies. <br />Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.