Laserfiche WebLink
Ll <br />AiltechPeft- <br />Compliance without Compromise <br />FACILITY INFORMATION: <br />P.O. Box 4208 <br />Sonora CA 95370 <br />Ca: 623541 A-Haz <br />Phone: 209-532-7320 <br />Fax: 209-533-2650 <br />mai[@aI[techpetro.com <br />www.alitechpetro.com <br />Facility Name: Hammer 1-5 Arco Date of Testing: Thursday, May 26, 2016 <br />Facility Address: 3250 W. Hammer Lane Stockton CA <br />Facility Contact: Wes Parkinson Phone: (209) 474-9125 <br />Notification Date of Local Agency: 05/19/16 <br />Name of Local Agency Inspector: Stacy Rivera <br />SPILL BUCKET TESTING INFORMATION: <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: 1 -Hour Observed Test <br />Equipment Resolution: 1/16" <br />Identify Spill Bucket <br />1 87A Syphon <br />2 87B Master <br />3 91 <br />4 <br />Bucket Installation Type: <br />❑ Direct Bury <br />® In Sump <br />❑ Direct Bury <br />® In Sump <br />❑ Direct Bury <br />® In Sump <br />❑ Direct Bury <br />El in Sump <br />Wait time between <br />applying vacuum/water <br />and start of test: <br />None <br />None <br />None <br />Test Start Time (T): <br />9:00 am <br />9:00 am <br />9:00 am <br />Initial Reading (R): <br />1 3/4" above cap <br />2 1/4" above cap <br />11/4" above cap <br />Test End Time (TF): <br />10:00 am <br />10:00 am <br />10:00 am <br />Final Reading (RF): <br />1 3/4" above cap <br />2 1/4" above cap <br />1°1/4" above cap <br />Test Duration (TF — T,): <br />j 1.0 Hr <br />1.0 Hr <br />1.0 Hr <br />Change in Reading (RF- R): <br />0.0 <br />0.0 <br />0.0 <br />Pass/Fail Threshold or <br />Criteria: <br />1/16" <br />1/16" <br />1/16" <br />Test Result: n, 129 Pass LJ Fail I IN Pass LJ Fail I J�g Pass LJ Fail ( (J Pass U Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow. -up for failed <br />tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with <br />legal requirements. <br />Signature of Technician: ; " _` Date: 05/26/16 <br />