My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2005-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 1:36:01 PM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2010
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232397_1777 W YOSEMITE_2005-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment*Used:Pressure Gauges in PSI/Nitrogen Equipment Resolution: 1110-15 PSI <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping <br /> n 1. <br /> iping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 31 3" <br /> Length of Piping Run: Approx.32' Approx.32' <br /> Product Stored: Fuel Oil Supply Fuel Oil Return <br /> Method and location of Clam Shell Test Port Clam Shell Test Port <br /> pi&�run isolation: At Building At Building <br /> Wait time between applying 15 Minutes 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 8:45 8:45 <br /> Initial Reading(RO: 5 PSI 5 PSI <br /> Test End Time: 9:45 9:45 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: I Hour I Hour <br /> Change in Reading(RF-R,): 0 PSI 0 PSI <br /> Pass/Fail Threshold or No Loss in PSI No Loss in PSI <br /> Criteria: <br /> Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail Pass Fail <br /> Comments—(include information on repairs made prior to"#qg and recommended�Iow-upfor ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.