Laserfiche WebLink
SWRCB,January 2002 Page I of <br /> 9. SPELIJOVERFELL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: 0 Spill Bucket Manufacturer Industry Standard X Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box#I Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: 1191 <br /> Bucket Depth: 12" <br /> Wait time between applying 10 Minutes <br /> water ands test: ' <br /> Test Start Time: 8:55 <br /> Initial Reading(RI): .001 <br /> Test End Time: 9:25 <br /> Final Reading(RF): .001 <br /> Test Duration: 30 Minutes <br /> Change in Reading(RF-R,): .000 <br /> Pass/Fail Threshold or .005/30 Minutes <br /> Criteria: <br /> Test Result: X Pass D Fail 0 Pass 0 Fail D Pass 0 Fail D Pass D Fail <br /> Comments—(include NLOrmation on repairs made prior to testing, and recommended follow-up for failed tests) <br />