Laserfiche WebLink
SWRC ,January 2002 Page of <br /> 5® SECONDARY PEPE TESTING <br /> Test Method Developed y: iping Manufacturer ❑Industry S ❑Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure ❑Vacuum 0 Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: res� � et.� `oma Equipment Resolution: o <br /> /®®PS BSS <br /> Piping Run#3 Piping Run# Piping Run iping Run <br /> Piping Material: S <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: woe, 1 9` <br /> Product Stored: QLr -1— <br /> Method and location of Clow, h e a <br /> piping-run isolation: tm ' <br /> ' - etween applyingressure/va uum/water and <br /> kw <br /> st: F�q $eeS <br /> Test Start Time: <br /> Initial Reading(RI): $3- <br /> fest <br /> -Test End Time: , a <br /> Final Reading(RF): s S Sed <br /> Test Duration: <br /> Change in Reading(RF-Rt): j <br /> Pass/Fail Threshold or <br /> Criteria: I p o LD f s Ivi P i:T tj v C.03 °t vx <br /> Test Result: Pass ❑ Fail WPass ❑Fail r"O Pass ❑Fail ❑ Pass ❑ Fa <br /> Comme 2ts—(include information on repairs made prior to testing; and recommended follow-up for failed tests) <br />