My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2005-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 1:36:01 PM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2010
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232397_1777 W YOSEMITE_2005-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,',January 2002Page 2 <br /> 5. SECONDARY PIPE TESTING10 <br /> Test Method Developed By: %❑ Tank Manufacturer F-1 Industry Standard El Professional Engineer <br /> El Other (Specify) <br /> Test Method Used: M Pressure F-1 Vacuum F1 Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> I= Piping Run# 1 DIE Piping Run# 1 DIE Piping Run# Piping Run# <br /> Piping Material: fiberglass fiberglass <br /> Piping Manufacturer: ameron ameron <br /> Piping Diameter: 311 311 <br /> Length of Piping Run: 19, 19 <br /> Product Stored: DIESEL DIESEL <br /> Method and location of sump/boot sump/boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min <br /> starting test: <br /> Test Start Time: 14 :50 14:54 <br /> Initial Reading(Ri ): 3psi 3psi <br /> Test End Time: 15:50 14:55 <br /> Final Reading(RF ): 3psi Opsi <br /> Test Duration: lhr imin <br /> Change in Reading(RF-I I ): 0 3psi <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.