Laserfiche WebLink
SWRCB;January 2002 Page 3. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard X❑ Professional Engineer <br /> 0 Other (Specify) <br /> Test Method Used: ❑ Pressure F] Vacuum 1XI Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: vplt Equipment Resolution: vplt tog ph <br /> Sump# 1 DIE Sump# 1 DIE Sump# Sump# <br /> Sump Diameter: 4811 48" <br /> Sump Depth: 451 45" <br /> Sump Material: FIBERGLASS FIBERGLASS <br /> Height from Tank Top to Top of 1611 1611 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 1211 1211 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 1811 911 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both T1ElNoE]N Yes EINo�N ❑Yes _]NoYes[:]No[_ <br /> product and water)?* <br /> Turbine shutdown response time: 2-5SEC 2-5SEC <br /> Is system programmed for fail-safe [I] ❑ ❑ � [:]Yes <br /> ❑ ❑ ❑ <br /> shutdown?* Yes N N X Yes N N Yes N N Yes No <br /> Was fail-safe verified to be ❑ ❑ ❑ � ❑ ❑ o <br /> operational?* X Yes N N X Yes N N 'X-'Yes N N X Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5MIN 5MIN <br /> test: <br /> Test Start Time: 15:42 16:18 <br /> Initial Reading(Ri): 1.647 2.857 <br /> Test End Time: 16:12 16:48 <br /> Final Reading(RF): -7.347 3.201 <br /> Test Duration: 3 0MIN 3 0MIN <br /> Change in Reading(RF-RI ): .7gph .02gph <br /> Pass/Fail Threshold or Criteria: .05gph .05gph <br /> Was sensor removed for testing? EYes No❑NA Yes N NA Yes N NA Yes nNo <br /> Was sensor properly replaced and Ye�N ❑Ye�N NA[]Yes fnctional after testing? 1flYeC]NC]NA � NA <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> second set of data is for trouble shooting only <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to my f the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />