Laserfiche WebLink
26545 <br />Kaiser Manteca Chiller Project <br />Page 2 <br />• SJEHD stated that upon receipt of complete package <br />review would be a matter of days <br />1.5 Review of proposed inspection methodology <br />Existing piping <br />o Precise line for the primary <br />o SB 988 for the secondary modified for no <br />disconnect of the pumps <br />New piping as currently installed <br />o Pump the inner pipe system up to 50 PSI and <br />hold for 4 hrs The outer piping will be 5 PSI for <br />4 hours <br />1.6 Schedule <br />• Lionakis will coordinate with Fuel Oil Systems to provide <br />a list of proposed submittal items — week of 12/22/08 <br />• SJEHD will review and comment — week of 12/29/08 <br />• Assemblage of submittal package — upon agreement <br />with SJEHD — week of 1/5/08 <br />• Submittal of package to SJEHD — week of 1/5/09 <br />• Approval & permit from SJEHD week of 1/12/09 <br />• Installation and inspection - TBD <br />These notes represent Lionakis's understanding of the discussion and events of the meeting. These <br />notes form the basis of future work. Should there be any incomplete or inaccurate information <br />contained herein, please notify this office immediately for appropriate action. This report, if not <br />corrected within five (5) days of receipt, shall be acknowledged as an accurate report of the events that <br />took place at this meeting. <br />SA2006\26545 Kaiser MAN Chiller Replacement\60 - Construction Administration\LBDG\Architectuml\Meetings\081218- SJEHD-MtgMin_26545.docx <br />