Laserfiche WebLink
M., <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-( a e 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORING (Check'a-11 <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) �1.--.,.�I y]) <br /> 0 1.CONTINUOUS ELECTRONIC MONITORING E] 2.FLOAT AND CHAIN ASSEMBLY [13.ELECTRONIC STAND-ALONE 4%-540- <br /> 4,NO DISPENSERS <br /> ------------------ [ 99m OTHER(Specify) <br /> 490-54b. <br /> LEAK MONITOR MANUFACTURER: 490-5-5 MODEL#: 490-56.- <br /> LEAK <br /> 90-5&LEAK SENSOR MANIUFACTURER: 490.57- <br /> MODEL#(S): 49458. <br /> DETECTION OF A LEAK INTO THE.UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. <br /> 11 a.1 ES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [] a.YES ❑ b.No 490-6D. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. El a.YES E] b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW Or,PRODUCT ATTHE DISPENSER. El a.YES [:] b.NO '0-62- <br /> UDC CONSTRUCTION IS: ❑ 1.SINGLE WALL ❑ Z DOUBLE WALL <br /> 49063. <br /> IFDOUBLEWALL: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b-PRESSURE ❑ c,VACUUM 490-64& <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES [] b.No 490-"b <br /> I. PERIODIC S iTEM-TESTING <br /> U 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49PX- <br /> -gj- LLAK DETECUQMLE-L-DI MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23CCR§26".Ij 2--SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> Ej 3-SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenanec records are kept for this facility: 00468. <br /> 0 a.ALARM LOGS n b.VISUAL INSPECTION RECORDS n c.TANK INTEGRITY TESTING RESULTS <br /> 0 d.SIR TESTING RESULTS(and supporting documentation records) 0 e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f,ATG TESTING RESULTS(and supporting documentation records) 0 g.CORROSION PROTECTION 60-DAY LOGS <br /> h.EQUIPMENTMAINITENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> 0 Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties; 49"9& <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that appy) <br /> 0 TIES UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> 19 Ol'ERAJING MANIJALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> 11 CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69,1 <br /> [I CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-6 <br /> %. <br /> 0 STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490.69f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 0 SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490.69s. <br /> 0 OTHER(Specify): 490-69k <br /> 490-69i. <br /> -UThis facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The 'Designated UST Operator"will train facility employ=in the proper operation and maintenance ofthe UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> > <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> > The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> Names)of contact person(q)for emergencies and Monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owncr/Operata,is responsible for ensuring that; 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment <br /> byfl!isp4an covered <br /> plan 2.)all conditions that indicate a Possible release are investjEoteo;and 3.)at properly <br /> v <br /> THE FOLWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> RMI TE ANCE <br /> 490-72. TITLE: 490-73. <br /> 490.74- TITLE: 490-75 <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the own - <br /> conditions that need follow-up action. owner/operator of any <br /> X11- OWNER/OPEOR SIGNATURE <br /> CERTIFICATION:I cerdfV that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-77. <br /> I /-, eT17. <br /> Q 3,Audmized EMMentafiw ofowma 490-76 <br /> APPLICANT NAME(print): 490-78. APPLICANT TITLE: 490-79. <br /> 6C^V-k-!E4e - <br /> UPCF UST-D(1212007)-3/4 www.unidecs.org <br />