Laserfiche WebLink
SRCB,January 2002 Page 2 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X� Tank Manufacturer O Industry Standard Professional Engineer <br /> Other (Specify) <br /> Test Method Used: X] Pressure Vacuum Hydrostatic <br /> O Other (Specify) <br /> Test Equipment Used:gauge Equipment Resolution: •2 Ops i <br /> MEMEMEEM <br /> Piping Run# 1 DIE Piping Run# Piping Run# Piping Run# <br /> Piping Material: dwf iberg 1 a s s <br /> Piping Manufacturer: ameron <br /> Piping Diameter: 311 <br /> Length of Piping Run: 50, <br /> Product Stored: DIESEL <br /> Method and location of sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min <br /> starting test: <br /> Test Start Time: 9:3 7 <br /> Initial Reading(I� ): 3psi <br /> Test End Time: 10:37 <br /> Final Reading(RF ): 3psi <br /> Test Duration: lhr <br /> Change in Reading(RF-I I ): 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />