My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 9:06:11 AM
Creation date
6/3/2020 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1777\PR0232397\MODIFICATION APPROVAL PLAN 2014.PDF
QuestysFileName
MODIFICATION APPROVAL PLAN 2014
QuestysRecordDate
11/16/2016 4:57:02 PM
QuestysRecordID
3258884
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From:, Belshire Environment Fax: (949) 4645210 <br />To: 12094683433@tcfax.cc Fax: +12094683433 Page 4 of 8 08P2812616 9:23 AM <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />0 Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: <br />0 Pressure 0 Vacuum <br />0 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: Test reducer boots, air compressor and gauges <br />Equipment Resolution: 0.5% of span <br />Diesel - Supply Diesel - Return <br />Diesel - Vent <br />Piping Material; <br />1� <br />Plastic Plastic <br />Plastic <br />Piping Manufaciu= <br />UGM Piping UGM Piping <br />Ameron- <br />Piping Diameter: <br />lot 1.541 <br />21t <br />Length of Piping Run: <br />40' 401 <br />20, - <br />Product Stored: <br />D D <br />D AUG 2 8 2010 <br />Method and location of <br />piping -run isolation: <br />/Fit /F <br />Reucer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fitts <br />d B /Fi i R d B R d B @00RONMENTP L <br />Wait time between applying <br />pressurelvacuum/water and <br />10 minutes 10 minutes <br />10 minutes <br />starting test: <br />Test Start Time: <br />08:20 AM 08:20 AM <br />08:20 AM <br />Initial Reading (-1;4): <br />5 5 <br />5 <br />Test End Time: <br />:20 AM <br />09:20 AM 09:20 <br />09:20 AM <br />Final Reading (Rit): <br />5 5 <br />5 <br />Test Duration: <br />60 Min 60 Min <br />60 Min <br />Change in Reading (Rf,44): <br />0 0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />No Detectable Loss No Detectable Loss <br />No Detectable Loss <br />Test Result: <br />Pass Pass <br />Pass <br />_ed f <br />-CommentS (include information on LvElrs made prlor to testing, and recommend follow-up for ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.