Laserfiche WebLink
x. <br />OMM1151MINImi, to I sit <br />Height from Tank Top to ♦est <br />�, Ur:: 5�M�M <br />Electrical Penetration: <br />........ ........ <br />gm W, <br />Portion of Sump Tested' �M , MR �= <br /># <br />WBjMR1 �O#RIVVU =!4j[J*TW1j1 0 Yes 0 No 0 NA POM 0 Yes 0 No ONA <br />Turbine shutdown response time N/A <br />Is system programmed for fail-safe OYes ONo®NA <br />shutdown?' <br />OYes E3NoONA <br />OYes []No®NA <br />OYes ONoRNA <br />Was fail-safe verified to be OYes ONo®NA <br />operational?* <br />OYes ONo®NA <br />OYes ONoONA <br />OYes ONo®NA <br />Wait time between applying <br />pressure/vacuum/water and starting 30 minutes <br />test: <br />Test Stan Time: 09:02 AM <br />Initial Reading (114): 7.7192 <br />Tea End Time: 09:17 AM <br />Final Reading (R,?): 7.7181 <br />Test Duration: 15 min, <br />Change in Reading (RF -111): -0.0001 <br />Pass/Fail Threshold or Criteria: +/-0.002" <br />Test Result: Pass <br />Was sensor removed for testing? Yes <br />Was sensor properly replaced and Yes <br />verified functional after testiq? I I I I I I <br />Comments — (include iy rmation on repairs made 2LJor to�in and reconintende folloiv-ipforfailed tests) <br />Sensor functionality was not confirmed. This Procedure is not part of the Secondary Containment Testing scope of work. <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk M is "N®" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />