My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:06:26 PM
Creation date
6/3/2020 9:56:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017-2018
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1777\PR0232397\RETROFIT PLAN 2017.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DoubleTr Flexible Double Containment PiA Manual <br />DoubleTrac Underground, Above Ground and Marina <br />Piping System <br />rM <br />y <br />a <br />C(&US <br />IS <br />09001 ��� �` <br />This manual provides the installer with general <br />instructions for the design and installation of <br />underground, above ground and marina fuel piping <br />systems using DoubleTrac® flexible petroleum piping <br />system with built-in secondary containment. <br />This information deals primarily with underground, <br />above ground and marina fuel piping. Other <br />components of the piping system have their own <br />individual installation instructions provided by the <br />equipment manufacturer. The installation instructions <br />provided by all component manufacturers must be <br />followed for the underground, above ground and <br />marina petroleum piping system to operate safely as <br />designed. <br />The OmegaFlex DoubleTrac® flexible piping system <br />must only be installed or serviced by a qualified installer <br />who has been trained through the Underground, <br />Above Ground and Marina Petroleum Piping Systems <br />Installation Training Program. The use of non -trained <br />personnel or any deviations from these written <br />procedures could result in damage or leakage of <br />the system and void the product warranty. Contact <br />OmegaFlex Customer Service for more information at <br />800-355-1039. <br />These instructions must be used in conjunction with <br />federal and state regulations for underground, above <br />ground and marina bulk petroleum storage and piping. <br />All underground, above ground and marina fuel piping <br />systems must be installed in accordance with recognized <br />engineering practices. The industry standards for the <br />installation of underground, above ground and marina <br />tanks including piping systems are PEI RP100, RP200 <br />and RP1000. <br />Page 2 <br />At the completion of work this installation manual must <br />be given to the site operator or owner. <br />If the DoubleTrac® system is improperly installed, the <br />contents of the piping may leak and possibly cause <br />personal injury or damage to the environment. The <br />instructions in this manual and applicable local codes <br />must be strictly followed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.