Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: (9 Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,air compressor and gauges Equipment Resolution: 0.5%of span <br /> Diesel-Supply Diesel-Return Diesel-Vent <br /> Piping Material: Plastic Plastic Plastic <br /> i <br /> Piping Manufacturer: UGM Piping UGM Piping Ameron <br /> Piping Diameter: 1" 1.5" 2" <br /> Length of Piping Run: 40' 40' 20' <br /> Product Stored: D D D <br /> Method and location of <br /> piping-run isolation; Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fittia <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minutes 10 Minutes 10 Minutes ��i�. n u <br /> starting test: <br /> Test Start Time: 09:00 AM 09:00 AM 09:00 AM P ;e <br /> Initial Reading(Ri): 5 5 S <br /> Test End Time: 10:00 AM 10:00 AM 10:00 AM <br /> Final Reading(RF): 5 5 5 <br /> Test Duration: 60 Min 60 Min 60 Min <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: No Detectable Loss No Detectable Loss No Detectable Loss <br /> Test Result: Pass Pass Pass <br /> Comments—(include inforiitation on repairs made prior to testing, and recoiiitttei?ded folloin-tip for failed tests) <br /> i <br /> i <br />