Laserfiche WebLink
6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer N Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum N Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: ancon TS-STs sump Test system Equipment Resolution: +/-0.002" <br /> Diesel/Piping <br /> Sump Diameter: 7 <br /> 4211 <br /> Sump Depth: 43.5" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 2l„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 13" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good <br /> Portion of Sump Tested' 4" Above Pen. <br /> Does turbine shut down when I <br /> sump sensor detects liquid(both ❑Yes❑No N NA ❑Yes❑No N NA ❑Yes❑No N NA ❑Yes❑No N NA <br /> product and water)?` <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe <br /> shutdown? ❑Yes❑No N NA ❑Yes❑No N NA ❑Yes❑No N NA ❑Yes❑No N NA <br /> Was fail-safe verified to be <br /> ❑Yes❑No N NA ❑ ® <br /> Yes❑No ®NA ❑Yes❑ No NA ❑ Yes❑No ®NA <br /> operational?* , <br /> Wait time between applying j <br /> pressure/vacuum/water and starting 30 minutes j <br /> test: l <br /> Test Start Time: 08:34 AM 1 <br /> Initial Reading(R& 4.0302 <br /> Test End Time: 08:49 AM Aai <br /> .w` <br /> Final Reading(Rr): 3.8309 <br /> Test Duration: 15 min. <br /> Change in Reading(RF-R): -0.1993 <br /> Pass/Fail Threshold or Criteria: +/-0.002" e A s a, qT <br /> Test Result: Fail <br /> Was sensor removed for testing? Yes <br /> Was sensor properly replaced and Yes <br /> verified functional after testing? <br /> i <br /> Comments—(include information on repairs made prior to testing, and reconu»endecifolloiv-erp for failed tests) ' <br /> Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment Testing scope of work. <br /> i <br /> I <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />