My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:06:26 PM
Creation date
6/3/2020 9:56:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017-2018
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1777\PR0232397\RETROFIT PLAN 2017.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer N Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum N Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: ancon TS-STs sump Test system Equipment Resolution: +/-0.002" <br /> Diesel/Piping <br /> Sump Diameter: 7 <br /> 4211 <br /> Sump Depth: 43.5" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 2l„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 13" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good <br /> Portion of Sump Tested' 4" Above Pen. <br /> Does turbine shut down when I <br /> sump sensor detects liquid(both ❑Yes❑No N NA ❑Yes❑No N NA ❑Yes❑No N NA ❑Yes❑No N NA <br /> product and water)?` <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe <br /> shutdown? ❑Yes❑No N NA ❑Yes❑No N NA ❑Yes❑No N NA ❑Yes❑No N NA <br /> Was fail-safe verified to be <br /> ❑Yes❑No N NA ❑ ® <br /> Yes❑No ®NA ❑Yes❑ No NA ❑ Yes❑No ®NA <br /> operational?* , <br /> Wait time between applying j <br /> pressure/vacuum/water and starting 30 minutes j <br /> test: l <br /> Test Start Time: 08:34 AM 1 <br /> Initial Reading(R& 4.0302 <br /> Test End Time: 08:49 AM Aai <br /> .w` <br /> Final Reading(Rr): 3.8309 <br /> Test Duration: 15 min. <br /> Change in Reading(RF-R): -0.1993 <br /> Pass/Fail Threshold or Criteria: +/-0.002" e A s a, qT <br /> Test Result: Fail <br /> Was sensor removed for testing? Yes <br /> Was sensor properly replaced and Yes <br /> verified functional after testing? <br /> i <br /> Comments—(include information on repairs made prior to testing, and reconu»endecifolloiv-erp for failed tests) ' <br /> Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment Testing scope of work. <br /> i <br /> I <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.