My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3434
>
2300 - Underground Storage Tank Program
>
PR0232398
>
COMPLIANCE INFO_2004-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:56:57 AM
Creation date
6/3/2020 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2015
RECORD_ID
PR0232398
PE
2361
FACILITY_ID
FA0003681
FACILITY_NAME
STOCKTON AUTO CENTER CAR WASH
STREET_NUMBER
3434
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12802011
CURRENT_STATUS
01
SITE_LOCATION
3434 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232398_3434 E HAMMER_2004-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
579
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Test Method Developed By: <br />Page of <br />1. SECONDARY PIPE TESTING <br />X Piping Manufacturer ❑ Industry Standard CI Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure ❑ Vacuum FI Hydrostatic <br />Cj Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br />MENEM <br />Piping Run #5 <br />MESEEMISEEMEMEEM <br />Piping Run # Piping Run # Piping Run # <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Piping Diameter: <br />4" x 3" <br />Length of Piping Run: <br />160' <br />Product Stored: <br />Gasoline Vapor -Vent <br />Method and location of <br />piping -run isolation: <br />Test boot at Vent <br />Piping Sump & FillSum #1&2 <br />Wait time between applying <br />pressure and starting test: <br />15 Minutes <br />Test Start Time: <br />11:30 <br />Initial Reading (RI): <br />5 Psi <br />Test End Time: <br />12:30 <br />Final Reading (RF): <br />5 Psi <br />Test Duration: <br />1 Hour <br />Change in Reading (RF -R,): <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />Test Result: X, Pass ❑ Fail ❑ Pass ❑ Fail 0 Pass ❑ Fail D Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.