Laserfiche WebLink
n <br />n <br />SWRCB, January 2002 Page of <br />2. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />MENEM <br />Sump # 1 <br />Sump # 2 <br />Sump # 3 <br />Sump # 4 <br />Sump Diameter: <br />42" <br />42" <br />42" <br />20" x 24" Box <br />Sump Depth: <br />52" <br />52 'h" <br />52 ''/:" <br />31 'h" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />9" <br />10" <br />9" <br />9 '/Z" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />13" <br />13" <br />13" <br />6 '/2" <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Dry <br />Dry <br />Portion of Sump Tested' <br />Water Level 17" <br />Water Level 17" <br />Water Level 17" <br />Water Level 12" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?` <br />Yes <br />Yes <br />Yes <br />No <br />Turbine shutdown response time <br />Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />N/A <br />Is system programmed for fail-safe <br />shutdown?* <br />Yes <br />Yes <br />Yes <br />N/A <br />Was fail-safe verified to be <br />operational?* <br />No <br />No <br />No <br />N/A <br />Wait time between applying water <br />and starting test: <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />9:05 <br />9:55 <br />10:45 <br />11:35 <br />Initial Reading (RI): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />9:35 <br />10:25 <br />11:15 <br />12:05 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading (RF -RI): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />.005130 Minutes <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑Fail <br />X Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No 'Ij NA <br />X Yes ❑ No ❑ NA <br />Was sensor properly replaced and X Yes ❑ No [INA X Yes ❑ No ❑ NA X Yes []No ❑ NA X Yes ❑ No [INA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />