Laserfiche WebLink
SWRCB, January 2002 `3 <br />Page of b <br />g_ SFrONDARV PYPF. TFCTYN(_ <br />Test Method Developed By:Piping Manufacturer ❑ Industry Standard O Professional Engineer <br />Other (Specify) <br />Test Method Used: \f�-Pressure ❑ Vacuum O Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: ie55u.V"k. (Y-ttm ,,r.<; •, S,� V", ", "d Grt. <br />Equipment Resolution: <br />Piping Run # <br />Piping Run # 2, <br />Piping Run #,-3 <br />Piping Run # <br />Piping Material: <br />F1 1 cT S 5 <br />.�v 4S <br />��� t GS 5 <br />F. �, s S <br />Piping Manufacturer: <br />S v,, f 4-1,", <br />Piping Diameter: <br />3 t <br />t <br />3 t <br />3 1 <br />Length of Piping Run: <br />rd lY2,1 <br />v dl , /2-s-1 <br />rey , 12r + <br />rd -2 I <br />Product Stored: <br />�c Gt Ia s- 8 % <br />✓ P <br />i t <br />a Se L -Vem -F- <br />Method and location of <br />i m -run isolation: <br />{ bo��u-f- <br />STP S!w. <br />4ql <br />_511 <br />7eO.� <br />reressssur �e between applying <br />uacuum/water and <br />starting test: <br />au V- <br />UU Y <br />Test Start Time: <br />p B 1 <br />t) ' Id <br />0: <br />Initial Reading (Rj): <br />/�S <br />5 PS -r <br />s �► s--T- <br />Test End Time: <br />U <br />U <br />�- f <br />Final Reading (RF): <br />s /95- -7 <br />5 <br />Test Duration: <br />yam' <br />h U Y <br />Change in Reading (RF -R,): <br />PS <br />5 <br />Pass/Fail Threshold or <br />Criteria: <br />0 t4,,r5 <br />1V,6 10j S 1 <br />tj d Los <br />N u La l 5 <br />Test Result: <br />Pass O Fail <br />Pass ❑ Fail <br />Pass O Fail <br />Pass ❑Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />