Laserfiche WebLink
SWRCB, January 2002 <br />- 5. SECONDARY PIPE TESTING <br />Page 'f of 8 <br />Test Method Developed By: Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />� Other (Specify) <br />Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic <br />Other (Spec) <br />Test Equipment Used: C t 5S �t V P ct.t� „S i S ,nl r 1=ra t t Equipment Resolution: -:t- <br />Piping Run #:5 <br />Piping Run # <br />iping Run # A <br />kiping Run # <br />Piping Material: <br />i= ) vt <br />Piping Manufacturer: <br />S ,J <br />Piping Diameter: <br />' X 3 1 <br />Length of Piping Run: <br />yV X , 160 1 <br />Product Stored: <br />G4 o t �,,o U4 f- otmr - <br />Method and location of <br />piping -run isolation: <br />ask 6ne.-A .F \) Wt <br />Su Y, i 115�. 2 <br />W ' e between applying <br />p essure vacu=water and <br />sta m test: <br />®u w <br />Test Start Time: <br />Initial Reading (111): <br />Test End Time: <br />/ 2 <br />Final Reading (RF): <br />$ PS X <br />Test Duration: <br />k 0 ve <br />Change in Reading (RF -RI): <br />$ <br />Pass/Fail Threshold or <br />Criteria: <br />LOSS ,ra ^ i`lf `T <br />Test Result: <br />ass ❑ Fail <br />❑ Pass 0 Fail <br />❑Pass ❑ Fail <br />❑ Pass ❑ F I <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />