Laserfiche WebLink
81/22/2004 09:27 209-4785 <br />. Jan 21 04 05:10P <br />SWItC,B, January 2002 <br />M <br />5. <br />T stMttbod t)cveloped By: <br />ipin$ <br />00 <br />'Kest Method Lfsed: <br />rest <br />D Other <br />Test Equipment Used: �a` <br />I <br />Piping Run # <br />pxpmtg Zvlaterisi: <br />t <br />Piping Manufacturer: <br />i <br />Piping Diameter: <br />tf <br />Length of Piping Run: <br />product Stored: <br />r <br />Iviethad andlocation 7of <br />piping -run isolation: <br />Wait tune between applying <br />pressurdvacumn/water and <br />f_ <br />F\ <br />starting test: <br />Test Start Tirne: <br />Nc <br />Initial heading (PQ: <br />Test End Time: <br />final heading Mr): <br />TCSt Duration: <br />Change inheading (RF•Ri): <br />Pass/Faii Threshold or <br />a / <br />RISHW41N & RIS. N PAGE 04/08 <br />2096.0214 p.5 <br />Page _�1 �f � • <br />:OtNAA$t`YPM TESTING <br />ufactMrcr";.'•"', ' [I Industry Standard 0 Professional Engineer <br />0 Vacuum Hydrostatic _. <br />ty) <br />����f �� i <br />.....-.....,.._...y' <br />pOGSnC <br />Equipment Resolution: <br />pipin $nn # Piping Run # Piping Run k _w <br />i <br />I` 0:.Rikp t' Vail 0 Pass 0 !Fail <br />• <br />i i. r 4r t I R a <br />