Laserfiche WebLink
,01/22/2004 09:27 209-47885 RISHWAIN & RIS IN PAGE 05/08 <br />Jan 21 04 M illo 20 56.0214 10.6 <br />SWRCB, January 2002 rage � _ of <br />6, KPING Stn" TESTING <br />Test•Method 1)eveloped By: ❑ Sump Manufacttu= ^4 C7IadasE7y Standard rofessional Engineer <br />0 Other (Spec) i <br />Test Method Used: Cl Pressure D Vacuum r5, —0, <br />❑ Other (Sped) <br />T=Equipment Used: j( e - rt 6S+C.- X1 CO- 1P Equipment Resolution_- <br />Sump t j e Stamp # Sump # Sump # <br />ir <br />sump Diazatettr rr �a _a " _ <br />Sump Depth: <br />Sump Material: <br />Height from Tank Top to Top of �� tf <br />gioest Piging Penetration: i ? <br />Heiglu groin Tank Top to Lowest <br />Electrical penetration: <br />C•ondidon of surnp prior to testing; <br />Fordo* of Sump Tested' <br />Does turbine shut down wbea � 21/ <br />scuup sensor detects liquid (both a Yes t;3'Fio ❑ NA ❑ YesNo O NA M Ycs ?Q ;'i NA i _l Ye. - Nu NA t <br />oduct and water)!' <br />Turbine shutdown response time <br />Is system programmed for fail-safe� — ^^-•• • '_._ f <br />❑ Yes 0141' ❑ NA ❑ Yes 21*o ❑ NA ❑ Yes Qr<o "; 7 NA ,Yea ' Nei `;.q <br />shutdown? t <br />Was fail-safe verified to be ❑ Yes �o ❑ NA ❑ Yea Ca'1Vo DNA n Yes ,� No ;'INA '1 Yes - ;: No . NAo rational?' <br />Wait time between applying <br />pressurctvacuum/water and starting th <br />I= Lx F lr•'S. I f{ <br />Test Start Time ? - - <br />Initial Reading <br />tvOt�S -- <br />Test End Time: --- <br />I <br />Final Reading (RF); <br />Test Duration: "-- - <br />Change in Reading, (Rp-Ro: <br />Pass/Fail Threshold or Criteria:Mill - <br />t'Apail ❑ Pass G Fail _ E <br />+.. <br />Was sensor removed for testing? 0 Yes o ❑ NA 0 Yes o ❑TVA ❑ Yes o P NA Il Yes NA <br />Was sensor properly replaced and <br />verified functional after testing') 0 Yes o Q NA 0 Yes CK0 Q NA MI Yes P-<a r' NA <br />Comments - (include information on repairs mode prior to testitrg, and recommended allow ujbr• Jaildd tes&v; <br />- <br />� `'�� S'�s•��•�-t� c�osr�,5��c'�; •- $taut; <br />' If the entire depth of the sump is not tested, specify how much was tested, If the answer to V—y Or tht questions indic:ucti tvltit ,tit <br />asterisk (•) is "NO" or "NA", the entire sump must be tested. (See SNMCS LG -160) <br />