My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2009-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 12:52:58 PM
Creation date
6/3/2020 9:57:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2013
RECORD_ID
PR0232494
PE
2361
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232494_7373 WEST_2009-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.k Page 2 of 2 <br /> or <br /> Title 22 California Code of Regulations UST emergency generator system exemptions are not allowed for <br /> USTs that are connected to both a generator and boiler piping. USTs which are only connected to an emergency <br /> generator get the emergency generator system exemptions. <br /> 2. The following is required to connect a steam boiler to the existing UST: <br /> a. The below—grade pipe between the day tank and generator engine needs secondary containment and <br /> monitoring. Usually this requirement is satisfied with double-walled pipe which drains to a sump with an electronic <br /> liquid sensor connected to the UST monitoring panel. The secondary containment needs to be tested triennially. <br /> Another option is to reroute the pipe above grade. <br /> b. The above-grade pipe needs a periodic line test which passes a leak threshold of 0.1 gallon/hour. <br /> Pressurized pipe needs an annual test. Gravity pipe needs a biennial test. Suction pipe needs a triennial test. <br /> This test is done by a SWRCB Licensed Tank Tester who is also a ICC certified technician. <br /> c. All above-grade pipe needs daily visual monitoring for leaks by Kaiser staff with the monitoring documented <br /> in a log. <br /> d. Installing the boiler and requirements listed in "a." must be done under an UST retrofit permit from the <br /> Environmental Health Department. The retrofit contractor must be ICC certified as a service technician. To break <br /> concrete, ICC certification as an UST installer/retrofitter is required. <br /> Kasey- <br /> We are working on putting together a defined scope of work to address the issues with the Stockton CUP. <br /> There seems to be some variations that are making it difficult to develop a plan of action. <br /> Please send me specific requirements to bring this facility into compliance. <br /> Thanks for your assistance with this. <br /> Jeff <br /> Jeffrey Deane, PMP <br /> Project Director-Modesto Medical Center <br /> Capital Projects Team Manager CVA <br /> CPFC Construction Manager CVA <br /> 209-735-5313 <br /> Cell-209-404-6412 <br /> 3/16/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.