.k Page 2 of 2 <br /> or <br /> Title 22 California Code of Regulations UST emergency generator system exemptions are not allowed for <br /> USTs that are connected to both a generator and boiler piping. USTs which are only connected to an emergency <br /> generator get the emergency generator system exemptions. <br /> 2. The following is required to connect a steam boiler to the existing UST: <br /> a. The below—grade pipe between the day tank and generator engine needs secondary containment and <br /> monitoring. Usually this requirement is satisfied with double-walled pipe which drains to a sump with an electronic <br /> liquid sensor connected to the UST monitoring panel. The secondary containment needs to be tested triennially. <br /> Another option is to reroute the pipe above grade. <br /> b. The above-grade pipe needs a periodic line test which passes a leak threshold of 0.1 gallon/hour. <br /> Pressurized pipe needs an annual test. Gravity pipe needs a biennial test. Suction pipe needs a triennial test. <br /> This test is done by a SWRCB Licensed Tank Tester who is also a ICC certified technician. <br /> c. All above-grade pipe needs daily visual monitoring for leaks by Kaiser staff with the monitoring documented <br /> in a log. <br /> d. Installing the boiler and requirements listed in "a." must be done under an UST retrofit permit from the <br /> Environmental Health Department. The retrofit contractor must be ICC certified as a service technician. To break <br /> concrete, ICC certification as an UST installer/retrofitter is required. <br /> Kasey- <br /> We are working on putting together a defined scope of work to address the issues with the Stockton CUP. <br /> There seems to be some variations that are making it difficult to develop a plan of action. <br /> Please send me specific requirements to bring this facility into compliance. <br /> Thanks for your assistance with this. <br /> Jeff <br /> Jeffrey Deane, PMP <br /> Project Director-Modesto Medical Center <br /> Capital Projects Team Manager CVA <br /> CPFC Construction Manager CVA <br /> 209-735-5313 <br /> Cell-209-404-6412 <br /> 3/16/2012 <br />