My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2014-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:27:31 PM
Creation date
6/3/2020 9:57:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2018
RECORD_ID
PR0232494
PE
2361
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232494_7373 WEST_2014-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,air compressor and gauges Equipment Resolution:0.5%of span <br /> Diesel#1 Diesel#2 <br /> Piping Material: Plastic Plastic <br /> Piping Manufacturer: Omega Flex Omega Flex <br /> Piping Diameter: 1.5" 1.5" <br /> Length of Piping Run: 100, 100, <br /> Product Stored: D D <br /> Method and location of <br /> i in -run isolation: Reducer Boots/Fittings Reducer Boots/Fittings <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minutes 10 Minutes <br /> starting test: <br /> Test Start Time: 09:00 AM 09:00 AM <br /> Initial Reading(R1): 5 5 <br /> Test End Time: 10:00 AM 10:00 AM <br /> Final Reading(RF): 5 5 <br /> Test Duration: 60 Min 60 Min <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: No Detectable Loss No Detectable Loss <br /> Test Result: Pass Pass <br /> Comments—(include information on repairs made prior to testing,onrd recoi?tntended follow,up for failed tests) <br /> Pip g is Omega Flex Doubletrac. <br /> i <br /> 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.