My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2014-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:27:31 PM
Creation date
6/3/2020 9:57:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2018
RECORD_ID
PR0232494
PE
2361
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232494_7373 WEST_2014-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Incon TS-STs sump Test System Equipment Resolution: +/-0.002" <br /> Diesel <br /> Sump Diameter: 421 <br /> Sump Depth: 60" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 24" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 56" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good <br /> Portion of Sump Tested' 4"Above Pen. <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No®NA ❑Yes❑No ®NA <br /> product and water)?' <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe <br /> -shutdown?* ElYes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No®NA ❑Yes❑No ®NA <br /> Was fail-safe verified to be ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No®NA ❑Yes❑No ®NA <br /> -operational?* <br /> Wait time between applying <br /> pressure/vacuum/waterand starting 30 minutes <br /> test: <br /> lTest Start Time: 08:59 AM <br /> Initial Reading(Rd: 5.6109 <br /> Test End Time: 09:14 AM <br /> Final Reading(RF): 5.4461 <br /> Test Duration: 15 min. <br /> Change in Reading(RF-RI): -0.1648 <br /> Pass/Fail Threshold or Criteria: +/-0.002" { <br /> Test Result: Fail <br /> Was sensor removed for testing? Yes <br /> Was sensor properly replaced and Yes <br /> verified functional after testing? <br /> r <br /> Comments—(include Information on repairs made prior to testing, and reconvnended folloie-up for failed tests) <br /> Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment Testing scope of work. <br /> Sump is failing below electricals at penetrations. Sump not tested above electricals. <br /> 1 <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.