Laserfiche WebLink
e <br /> SWRCB,January 2002 Page of <br /> . SECONDARY PIPE TESTING <br /> Test Method Developedy: U PipingStandard 13 ProfessionalEngineer <br /> erci.fy) <br /> Test Method U e Uvacuum. U Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: 15 ps.L gauge Equipment Resolution: <br /> ENNNNUP'pi=#1 'ping Run#Z Piping Run#3 Piping Run <br /> Piping al: Fiberglass Fiberglass Fiberglass <br /> Piping Maraff1ichm: Ameron Ameron Amerou <br /> PipingDiameter: " 3" 3" <br /> Length of Piping Run: 105, 105, 105, <br /> Product Stored: Premium Plus Regular <br /> Method and location of <br /> piping-run 'on: ('stn Kip e.- u ova � TZ, LY C;- aj <br /> Wait e between applying <br /> pr d 5mi . 5 Win. 5 ' . <br /> starting test: <br /> Test Start Tune: 10: 10: 10:30 <br /> Initial Reading ): S p.s.i. 5 p.s.i. 5 p.s.L <br /> Test End Time: 11: 11: 11:30 <br /> Fin g ): 5 p.s.i. 5 p.s.i. 5 ps.L <br /> Test Duration: 1 hr. 1 Im 1 hr. <br /> Change in Reading 0 <br /> PasstFail Threshold or 0 0 <br /> Criteria: <br /> �. UFO-: F <br /> Com m e —('incl rexm made Lmor tog,and recommendedPoll up for failed tests) <br /> =Premium product <br /> =Plus product <br /> Regular pioduct <br />